Laserfiche WebLink
<br />PROPROSED PUD AMENDMENT <br /> <br />Proposed Buildout of Centre Pointe Status Gross Area <br />C.P.B.P. Phase 2 Building A & B Built 101,886 <br />Ehlers and Associates Built 13,425 <br />Veritas software Built 62,420 <br />c.P.B.P. Phase 1 Building A & B Built 25,445 <br />Builders Association Built 15,120 <br />Office Building Built 12,015 <br />Fairfield Hotel Built 37,013 <br />Residence Hotel Built 75,391 <br />Courtyard by Marriott Hotel Under Construction 71,028 <br />Proposed Office Undeveloped 6,600 <br />Subtotal 420,343 <br />Veritas Building 1 Under Construction 143,157 <br />Veri/as Building 2 Proposed 120,000 <br />Veri/as Building 3 Proposed 120,000 <br />Total Proposed Veritas 383,157 <br />Total S.F. proposed 803,500 <br />Total S.F. permitted by 2000 PUD 681,064 1 <br /> <br />1. The City of Roseville approved the Veri/as Software development in 2000. <br />2. This revised building square footage was a result of the approved Veritas Software development/minor <br />administrative P.U.D. amendment authorized by City Code which permits 10% increase. <br /> <br />The project will utilize the existing roads, water, sanitary sewer, storm sewer and <br />stormwater ponds on the site, making only minor adjustments in the infrastructure <br />required to service the proposed buildings. Due to past environmental clean-up <br />and mass grading which has occurred on the site, only minimal earthwork is <br />anticipated. The Centre Pointe Business Park has been planned for redevelopment <br />by the City of Roseville. Water mains, storm and sanitary sewers, and on-site and <br />regional stormwater ponding areas are all designed to service the site. Veritas <br />proposes to utilize the City's regional storm water ponding system, which <br />currently exists. <br /> <br />J <br /> <br />The proposed buildings will be four-stories tall, which is permitted within the <br />original PUD. When fully developed, the total area of all buildings in Centre <br />Pointe Business Park will be 803,500 square feet, plus the 110,000 SF built by <br />Woodbridge pursuant to the 1985 approval by the City of Roseville. <br /> <br />"1 <br />j <br /> <br />The construction schedule for the project is estimated to occur over the next three <br />years. During this time, noise from construction equipment and construction dirt <br />and dust will need to be controlled. Minnesota Best Management Practices will <br />be followed to minimize the impact of construction and control erosion. <br /> <br />Page 7 <br />