Laserfiche WebLink
<br />---" ~~~ <br /> <br />. - .... <br />;-;.:....--_ 'r ".;,;.,,:-,-V .". <br /> <br />... .-......._.~.... ..' .-J.: .~. r <br /> <br />-,-. .....-.-... <br /> <br />12. <br /> <br />Physical Impacts on Water Resources: Will the project involve the physical <br />or hydrologic alteration (dredging, filling, stream diversion, outfall structure, <br />diking, impoundment) of any surface water (lake, pond, wetland, stream, <br />drainage ditch)? <br /> <br />] <br />J <br /> <br />Yes <br /> <br />No <br /> <br />-1 <br />I <br /> <br />If yes, identify the water resource to be affected and describe: The alteration, <br />including the construction process; volumes of dredged or fill material; area <br />affected; length of stream diversion; water surface area affected; timing and <br />extent of fluctuations in water surface elevations; spoils disposal sites; and <br />proposed mitigation measures to minimize impacts. <br /> <br />The project will not involve physical or hydrologic alteration of any surface <br />water. <br /> <br />13. Water Use: <br />a. WiD the project involve the installation or abandonment of any wells? <br />Yes No <br /> <br />There are no wells on the site that will be abandoned as a result of the <br />project. (phase I Environmental Site Assessment by Delta Environmental <br />Consultants, Inc., 1994, p. 5 - Appendix B). <br /> <br />The development will be served by the existing municipal water system <br />and will not involve the installation of any wells. <br /> <br />For abandoned wells give the location and Unique well number. For new <br />wells, or other previously un-permitted wells, give the location and purpose <br />of the well and the Unique well number (if known). <br /> <br />b. Will the project require an appropriation of ground or surface water <br />(including dewatering)? <br />Yes No <br /> <br />J <br /> <br />1 <br />J <br /> <br />No appropriation of ground or surface water will be required. No <br />dewatering is expected to occur. <br /> <br />If yes, indicate the source, quantity, duration, purpose ofthe appropriation, <br />and DNR water appropriation permit number of any existing appropriation. <br />Discuss the impact of the appropriation on ground water levels. <br /> <br />Page 13 <br />