Laserfiche WebLink
<br />c. Will the project require connection to a public water supply? <br />Yes No <br /> <br />If yes, identify the supply, the DNR water appropriations permit number of <br />the supply, and the quantity to be used. <br /> <br />'\ <br />I <br /> <br />The City of Roseville municipal water supply will be used. Roseville <br />receives its water from the City of St. Paul, Appropriation Permit Numbers <br />756227 (Vadnais Lake), 756228 (Centerville Lake), 756229 (Otter Lake), <br />756230 (Mississippi River), and 776229 (unnamed groundwater wells). <br />Water is utilized from the 5 sources in approximately equal amounts. <br /> <br />Using an average annual demand per square foot of 0.070 gpd/ff for <br />commercial uses, MJ. Hammer and W. Viessman, Jr., Water Supply and <br />Pollution Control, 5th Edition, (New York: Harper Collins College <br />Publishers, 1993). Total water demand for the site would be 26,821 GPD. <br />According to the St. Paul Water Utility, the maximum capacity of their <br />water supply facility is 168 million GPD and their current average <br />utilization rate is 52 million GPD. There is sufficient capacity to <br />accommodate the estimated demand of 26,821 GPD for the site. <br /> <br />14. Water-related Land Use Management Districts: Does any part of the project <br />site involve a shoreland zoning district, a delineated IOO-year flood plain, or <br />a state of federally designated wild or scenic river land use district? <br />Yes No <br /> <br />If yes, identify the district and discuss the compatibility of the project with <br />the land use restrictions of the district. <br /> <br />J <br />J <br /> <br />The City of Roseville has a shoreland management ordinance that applies to <br />specified water bodies in the City, which are listed in the ordinance (Subsection <br />1016.13). The project site does not contain any of the specified water bodies, nor <br />does any shoreland district extend onto the project site from nearby water bodies. <br />Although DNR Wetland 50W is near the site on the south and 203W on the east, <br />neither of these bodies is listed in the shoreland ordinance. Therefore, the project <br />site does not involve a shoreland district. <br /> <br />No floodplains or river-related districts have been established in Roseville. <br /> <br />Page 14 <br />