Laserfiche WebLink
<br />'J <br /> <br />27. <br /> <br />Will the project create adverse visual impacts? (Examples include: glare <br />from intense lights, lights visible in wilderness areas, and large visible plums <br />from cooling towers or exhaust stacks.) <br /> <br />, <br />I <br />] <br /> <br />Yes No If yes explain. <br />The proposed increase in building square footage is not anticipated to produce any <br />adverse visual impacts. This additional office space will be designed to be <br />compatible with adjacent businesses. The surrounding area is developed and does <br />not constitute scenic vista or wilderness area that would be intruded upon. No <br />intense lighting, cooling towers, or large exhaust stacks are anticipated on the site. <br /> <br />" <br />I <br />; <br /> <br />28. Compatibility with plans: Is the project subject to an adopted local <br />comprehensive land use plan or any other applicable land use, water, or <br />resource management plan of a local, regional, state, or federal agency? <br />Yes No <br /> <br />If yes, identify the applicable plan(s), discuss the compatibility ofthe project <br />with the provisions of the plan(s), and explain how any conflicts between the <br />project and the plan(s) will be resolved. Uno, explain. <br /> <br />The City of Roseville's current Comprehensive Plan, adopted on September 12, <br />1994 and revised January 10, 1996 (Figure 8) guides the site for Business uses, a <br />designation that "deals with high volume retail, restaurants, office parks, gas <br />stations and other high traffic generating users." <br /> <br />29. <br /> <br />Impact on Infrastructure and Public Services: <br />WiD new or expanded utilities, roads, other infrastructure, or public services <br />be required to serve the project? <br />Yes No <br /> <br />J <br /> <br />Centre Pointe Business Park has most required infrastructure in place. The water <br />mains and sanitary sewer were constructed concurrent with the existing internal <br />road system. Minor relocation of infrastructure may be required to accommodate <br />slight differences between the new site layout and the original proposal. All main <br />storm sewer lines are in place. New site-specific storm sewers will be required to <br />direct roof and parking lot drainage to the ponds. <br /> <br />" <br />I <br />J <br /> <br />All required external infrastructure is in place and has adequate capacity to serve <br />the project, as documented in responses to previous questions. <br /> <br />Page 32 <br />