Laserfiche WebLink
<br />Received: 8/ 2/00 13:49; <br /> <br />612 252 9077 -> City of Roseville; <br /> <br />Page 4 <br /> <br />08/02/2000 WED 13:44 FAX 612 252 9077 LANDFORM ENGINEERING CO <br /> <br />~ 004/004 <br /> <br />HURST & ASSOCIATES CONSULTING ENGINEERS <br /> <br />308 HILLWOOO AVENUE .-FALlS CHURCH, VIRGINIA 2204S <br />TELEPHONE: 7OW34-78'72 <br />FACSIMIle: 703-6~70 <br />E-MAIL: lDoII8S@mnsinc.ccm <br /> <br />CLYDE 0. HuRSt; P.E. <br />CLYDE G. ~RST III. P.E. <br /> <br />April 30, 2000 ' <br /> <br />Mr. ]efftey A. S. McDonell P .E. <br />LandForm Engineering Company <br />Suite 650 <br />510 First Avenue North <br />Minneapolis, Minnesota 55403 <br /> <br />Re: Sunrise Roseville <br />LandFonn Project# E500001 <br /> <br />Dear Mr. McDowell: <br /> <br />We have received your request for m.aximum capacities of plumbing and mechairical so that you <br />may verify utility capacities. Fran Lao, of our office, has previously provided you with the <br />electrical load infonilation. Below I have, compiled the plumbing and gas infonnation that I <br />believe y~~, ate,requesting. .p'ease review it and call me if you need additional detail. <br /> <br />1. Sanitary Drainage Fixture Units (DFUs) = 720 <br />2. '3" Domestic Water Service <br />3. 6" Sanitary Line <br />4. 6" Sprinkler Line <br />5. 7,500,000 Btuh gas inp~t. " <br /> <br />It should be understood that this infomlation is preliminary and is b~sed on previous designs of <br />, similar configuration. ' It is subj~t to minor change ,as the design is firialized. Please plan <br />accordingly. " ' , ' <br /> <br /> <br />cc: <br /> <br />Be,ery ,Rio <br /> <br />" <br /> <br />" <br />. : <br /> <br />" , <br />