Laserfiche WebLink
<br />612 252 9077 -> Ci~y o~ Roseville; Page 3 <br />Received: 81 2/00 13:49; <br />08/02/2000 WED 13:44 FAX 612 252 9077 LANDFORM ENGINEERING CO <br /> <br />.. <br /> <br />Apr-~~-OO ~5:13 <br /> <br />Preliminary load Letter -- Dat8:04/11/oo <br />}t~rst Associates Project Sunrise Roseville, MN. <br /> <br />Customer Name: Sunrise Assisted Uving Development Offi~~t , _ <br />220 Huron Street, Suite 500, East Chicago, Illinois 60610 <br /> <br />Tefephone Number: (312)-255-9987 <br />Service Address: Roseville. MN 99164 <br />County/State: Roseville. MN Desired Service Date: <br />Mailing AddJ'eSs: <br /> <br />This Service is: New Buikfing: X <br />SqtJPre Footages of BUilding/Addition: 3Story 83 units (approx. 62,000 $q. ft.) <br />Sentice Voltage: 1201208'1, 3 phase, 4w + G <br />Main Service SI%e: (3000 Amp.) Size of secondary Conductor: (88ets) 500MCM <br />Switchboard with: Copper <br />3 Mains and 3 max. spaces. (1-3P-1200A, 1-3P-12OOA. & 1-3P-1000A) <br /> <br />Connected load <br />Single Phase <br />(KW or HP) <br />120 KW <br />650 KW <br /> <br />Three Phase <br />(KW or HP) <br /> <br />Ughting: <br />Heat PumplHeatlng: <br />Air Conditioning: <br />Motors~ o-otal): <br />Elevators: <br />Fire Pump: <br />Kitchen Equipment & <br />small appliance load: 105 KW <br />Receptacles: 120 KW <br /> <br />375 KW <br />50KW <br />66 KW (20HP) <br />35 KW (20HP) <br /> <br />Owner. Sunrise Deveropment. Inc. - 771 East Lancaster Avenue. Villano'la; PA 19085 <br />Architect: Berry Rfos & AssocAl001 Braddock Rd.Springfleld, VA 22151(103) 426-9057 <br />Consufting Engineer. Hurst & Associates 308 Hillwood Ave., Falls Church, VA 22152 <br />(703) 534-7812 Fax. No. (703}-536-3970: e-mail: hurst@hurstengineers.com <br /> <br />General Contractor: none selected at this time <br />Electrical Designer: Francisco Lao @ Hurst & Associates <br />Electrician: none selected at this time <br /> <br />Note: We are requesting a master metering- se,rvice on this project. since this building <br />Is considered a Health Care Facility as defined by NFPA and Is considered a <br />Transient Building. <br /> <br />4 <br /> <br />I4J 003/004 <br /> <br />P.04 <br />