My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03197
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3100
>
pf_03197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 12:58:01 PM
Creation date
12/8/2004 4:01:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />1.0 <br /> <br />1.1 <br /> <br />2.0 <br /> <br />2.1 <br /> <br />2.2 <br /> <br />2.3 <br /> <br />2.4 <br /> <br />3.0 <br /> <br />3.1 <br /> <br />REQUEST FOR PLANNING COMMISSION ACTION <br /> <br />DATE: 03/08/00 <br />ITEM NO: 6 (B) <br /> <br />Agenda Section: <br />PUBLIC HEARINGS <br /> <br />i S, Inc. for the vacation of a portion of the <br />t lying on a part Lot 6, Block 1 Centre Pointe <br /> <br />ACTIO~ . <br /> <br />Ry ompanies is requesting the vacation of a portion of the utility and drainage easement <br />ly,' g adjacent to the northwestern section of the storm water management pond. The <br />proposed vacated easement area would be replaced by a new easement along the eastern part <br />of the pond resulting in a more attractive pond that has equal capacity and functionality. <br />(legal descriptions attached). <br /> <br />BACKGROUND <br /> <br />Ryan Companies is requesting the utility/drainage easement vacation in connection with the <br />three phase Veritas development. The first phase of the development includes site grading, <br />utility installation, and construction of a five-story office building. <br /> <br />The area surrounding the office structure incorporates generous green space areas for <br />employees to recreate and relax. One such area modifies the northwest portion of the <br />existing storm water pond. This modification includes re-grading the pond at the northwest <br />location to create a unique open space area and adequate space for the relocated trail. The <br />pond will also be re-graded on the east to provide the required holding capacity. <br /> <br />Section 1013.04 outlines the procedure for vacating streets, alleys, and easements. A public <br />hearing is required. The Planning Commission holds the hearing and recommends action on <br />the vacation request to the City Council. <br /> <br />The city policy is to assist property owners, where engineering is possible, to vacate, <br />relocate, and upgrade utilities and property at the property owner's expense. <br /> <br />STAFF COMMENTS <br /> <br />Unlike recent utility and drainage easement vacations, this requested easement vacation does <br />not involve the relocation of any public utilities. The easement vacation does involve re- <br />grading of portions of the existing pond and the requirement to restore the required storm <br />retention capacity by the property owner. <br /> <br />PF3197 - RPCA (03/08/00) - Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.