Laserfiche WebLink
<br />May 12. 2000 <br />Page 2014 . <br /> <br />The site will have two driveway access points. Both drives are off of CentrePointe <br />Drive; one on the south. and one on the north that is a shared' drive with the office <br />building on the north. The site contains a paved silrface parking lot with 156 spaces. The <br />tront entrance has a covered porte-cochere for guest drop-off and pick-up. Internal site <br />sidewalks will connect to both the street sidewalks and the walking paths within the <br />present development. The'courtyard within the backyard of the building is a screened <br />with a wall and contains fenced a large patio and heavily landscaped grounds. The rest of <br />the site is also heavily landscaped and maintained as well. <br /> <br />The structure is three stories in height with a pitched roof. Exterior materials will include <br />brick, EIFS, glass, asphalt shingles on the high roof, and standing seam metal on the low <br />roofs. The brick and EIFS colors will be similar and complimentary to the surrounding <br />buildings within the development. <br /> <br />If the project is approved and all goes as planned, it is anticipated that construction would <br />start this summer and would be open in late spring of 200 1. <br /> <br />Cordially, <br /> <br />~~D <br /> <br />Joseph M. Samuel, P.E. <br />Professional Engineer <br /> <br />H:\ADMIN-DOCS\My Documents\99420\Revisesd 5.12.00 Veritas-Roseville.doc <br />