Laserfiche WebLink
<br />6.2 The proposed redevelopment of the parcel into a professional office and supportive housing <br />complex does not require expansion or extension of City infrastructure such as utilities and <br />streets. <br /> <br />6.3 Jobs and Value: The four parcels have a current land and building value of $284, 1 000 <br />(Ramsey County Assessor). The Accessible Space project value is estimated at $2.5 million <br />including property acquisition and site development costs. The non-profit housing project will <br />not generate property taxes. The supportive housing project is anticipated to employ three to <br />four fulltime job equivalents, but no more than two employees at any given time. <br /> <br />6.4 The VSI office complex is estimated at $1.28 million for its site development cost. The office <br />complex will annually pay in excess of $22,000 in property taxes. The applicants estimate that <br />there will be 4 to 6 jobs per 4,000 sq. ft. of office space or approximately 16 to 24 jobs. It is <br />possible that some of these jobs will be filled by qualified candidates/residents of the adjacent <br />new apartment building. <br /> <br />7.0 RECOMMENDED CONDITIONS: <br /> <br />7.1 The design of both structures should be compatible with the general context and human scale of <br />the neighborhood for both architecture design and building materials. Though each structure <br />incorporates a hip roof to lower overall height, other architectural elements should be <br />incorporated to further enhance each structure and reduce linear mass. This could include <br />different sets of windows, large expanses of similar facade materials, contextually matching <br />brick, and dormers. <br /> <br />7.2 The conceptual landscape plan, including proposed fencing, provides a starting point to begin <br />discussion on both boulevard and site landscaping. The plan must be revised to incorporate <br />plantings within Lexington Avenue and Roselawn Avenue consistent with the Street Tree <br />Master Plan. As well, care must be given to the choice of screening used between the parking <br />lot and adjacent apartment complex and the east property line and the adjacent residential <br />properties. <br /> <br />7.3 The Public Works Department is currently reviewing the grading, drainage, and utility plans <br />proposed with the General Concept Plan submittal. All plans, including the location of fire <br />hydrants and utility services connections, require the approval of the Public Works Department <br />(see attached memo). <br /> <br />7.4 All buildings, debris, and any soil contamination must be removed from the site prior to the <br />issuance of a building permits. <br /> <br />7.5 Signage must be an integral part of the architectural plans and sign banding and monument <br />signage locations must be designated on the site. <br /> <br />7.6 Sharing of parking and access must be accomplished by legal document binding both property <br />owners. <br /> <br />PF3224 - RPCA Accessible Space Concept Plan 020602 Page 7 of 8 <br />