Laserfiche WebLink
<br />Page 2 <br />7 July, 2000 <br /> <br />15. Disposal issues may require an exterior enclosure and screening. Coordination with the <br />church would be preferred. If it is outside, it needs to be enclosed with roof and doors. The <br />site is in a residential district, but the volume is the determinant factor. An enclosure must be <br />within 6' of the building in materials similar to the building. 180 gallons is the unit size before <br />an enclosure is needed. <br /> <br />16. Exterior lighting will need to be a shoebox style downcast. This will also effect security <br />lighting. <br /> <br />17. A brief narrative/discussion of the school value and approvals to the site. The technical issues <br />appear to be solved. Carol will draft something today. <br /> <br />18. Number of spaces taken up by parking should be noted. About 54 will be lost. <br /> <br />19. The sanctuary has pew seating for 506. The parking needs for churches are 1 space per 3.5 <br />seats. This requires 144 spaces. This is okay on site. <br /> <br />20. A revised plan with optional locations should be shown. A faxed plan to Thomas is sufficient <br />(651-490-2931). <br /> <br />21. Dan Munson (651-415-2120) is building inspector and plan review person. <br />22. Apply for building permit. (5 sets of site plans, 3 sets of building plans - structure) <br /> <br />Can take 8-10 days to review. <br />SAC charges 602-1113 Jodi Edwards <br />Will verify state seal on modulars. <br />Verify anchoring on site (wind and shear; typical footing detail). <br />Access to building - ramp and steps. <br />Engineering looks for site utilities. <br />Site utilities permit. <br />If go into street. require access permits. <br />If tie into existing building. then size and capacity will need to be checked. <br />Can apply two weeks ahead of time (prior to Council approval). <br />Spot lights on building will need to be reviewed. <br /> <br />23. Site Drawing Plan <br /> <br />Utilities <br />Boundary of Property <br />Landscaping (not required) <br />Utility Drawings (signed by engineer) <br />Electrical Service Location <br /> <br />24. Building Drawings <br /> <br />Foundation Plan (signed by structural engineer) <br />Steps/Ramp Accessible Drawing <br /> <br />25. Fire Marshall - John Loftus - 490-2240 <br /> <br />May comment on plans and then issue building permits with separate permits for fire alarm. <br /> <br />G:\2017 -01 \Correspondence\mo070600pm. dot . <br />