Laserfiche WebLink
<br />Based on the samples collected and analyzed, the following materials were determined to <br />contain asbestos. The quantity of each material was estimated. <br /> <br />Material Locations Quantity % and type <br /> of ACM <br />9" by 9" light tan and tan Throughout most of bldg. 17,925 5% <br />streaks floor tile (grey) square feet Chrysotile <br />12" by 12" white with streaks Teen Room 2,000 3% <br />floor tile and mastic square feet Chrysotile <br />Black line floor tile Gymnasium 100 square 3% <br /> feet Chrysotile <br />Transite board Courtyard, Teen room, Exterior. 1,380 40% <br /> gymnasium square feet Chrysotile <br />Grey caulk Rooms that border courtyard 140 linear 3% <br /> feet. Chrysotile <br />Roof Seam Cover Roof 150 square 3% <br /> feet Chrysotile <br />Roof Tar Roof 20,000 5% <br /> square feet. Chrysotile <br />Air Conditioner Insulation AC units on Roof 1,000 5% <br /> square feet Chrysoti Ie <br />Grey Roof Caulk AC units on Roof 300 linear 3% <br /> feet Chrysotile <br /> <br />... <br /> <br />Specific information describing the type, quantity, and location of ACM in each room of <br />the building is found in the table in Appendix C. <br /> <br />" <br /> <br />10 <br /> <br />Demolition Asbestos Survey <br />DPRA Project No. 5781.0002.0001 <br />September 15,2000 <br /> <br />Roseville Activity Center <br />Roseville, MN <br />