My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03283
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2012 12:40:36 PM
Creation date
12/9/2004 7:01:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3283
Planning Files - Type
Planned Unit Development
Project Name
Centre Pointe
Applicant
Ryan
Status
Approved
Date Final City Council Action
3/26/2001
Planning Files - Ordinance #
1249
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PROPROSED PUD AMENDMENT <br /> <br />Proposed Buildout of Centre Pointe Status Gross Area <br />C.P.B.P. Phase 2 Building A & B Built 101,886 <br />Ehlers and Associates Built 13,425 <br />Verjtas software Built 62,420 <br />C.P.B.P. Phase 1 Building A & B Built 25,445 <br />Builders Association Built 15,120 <br />Office Building Built 12,015 <br />Fairfield Hotel Built 37,013 <br />Residence Hotel Built 75,391 <br />Courtyard by Marriott Hotel Under Construction 71,028 <br />Proposed restaurant Undeveloped 6,000 <br />Subtotal 419,743 <br />Veritas Building 1 Under Construction 143,157 <br />Veritas Building 2 Proposed 120,000 <br />Veritas building 3 Proposed 120,000 <br />Total Proposed Veritas 383,157 <br />Total S.F. proposed 802,900 <br />Total S.F. permitted by 2000 PUD 681,064 2 <br /> <br />1. The City of Roseville approved the Veritas Software development in 2000. <br />2. This revised building squarefootage was a result of the approved Veritas Software development/minor <br />administrative P. V.D. amendment authorized by City Code which permits 10% increase. <br /> <br />The project will utilize the existing roads, water, sanitary sewer, storm sewer and <br />stormwater ponds on the site, making only minor adjustments in the infrastructure <br />required to service the proposed buildings. Due to past environmental clean-up <br />and mass grading which has occurred on the site, only minimal earthwork is <br />anticipated. The Centre Pointe Business Park has been planned for redevelopment <br />by the City of Roseville. Water mains, storm and sanitary sewers, and on-site and <br />regional stormwater ponding areas are all designed to service the site. Veritas <br />proposes to utilize the City's regional storm water ponding system, which <br />currently exists. <br /> <br />The proposed buildings will be four-stories tall, which is permitted within the <br />original PUD. When fully developed, the total area of all buildings in Centre <br />Pointe Business Park will be 802,900 square feet, plus the 110,000 SF built by <br />Woodbridge pursuant to the 1985 approval by the City ofRoseville. <br /> <br />The construction schedule for the project is estimated to occur over the next three <br />years. During this time, noise from construction equipment and construction dirt <br />and dust will need to be controlled. Minnesota Best Management Practices will <br />be followed to minimize the impact of construction and control erosion. <br /> <br />Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.