Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Provide a 50 or fewer word abstract for use in the EQB Monitor notice: <br /> <br />Veritas Software is proposing to construct an additional 121,836 SF of office <br />space at Centre Pointe Business Park in Roseville, MN. Upon development of the <br />additional121,836 SF, the completed business park will consist of three hotels, <br />two sit-down restaurants, office buildings, office-showrooms, and office- <br />manufacturing buildings totaling 802,900 SF of floor area and 2,648 parking <br />spaces. The entire site, which was graded in association with two prior <br />development plans, currently provides sewer, water, roads and storm water ponds <br />required to service the development. <br /> <br />7. <br /> <br />Project Magnitude Data: <br />Total Project Area (acres) or Length (miles): 47.6 acres (15.6 Veritas site) <br />Number of Residential Units: No residential units will be constructed <br />Unattached: N/ A Attached: N/ A <br />Commercial/Industrial/Institutional building Area (gross floor space): <br />Total square feet: 802,900. <br />Indicate area of specific uses: <br /> <br /> Square Feet <br />Office: 613,468 <br />Office/Manufacturing: 0 <br />Retail: 0 <br />Other Industrial: 0 <br />Warehouse: 0 <br />Institutional: 0 <br />Light Industrial: 0 <br />Agricultural: 0 <br />Other Commercial (specify): <br />Hotel 183,432 <br />Restaurant 6,000 <br /> <br />Building Heights: Vary from 1-5 stories, maximum 60-foot height. <br /> <br />8. <br /> <br />Permits and Approvals Required: <br />List all known local, state, and federal permits, approvals, and funding <br />required: <br /> <br />Page 8 <br />