My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03283
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03283
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/22/2012 12:40:36 PM
Creation date
12/9/2004 7:01:59 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3283
Planning Files - Type
Planned Unit Development
Project Name
Centre Pointe
Applicant
Ryan
Status
Approved
Date Final City Council Action
3/26/2001
Planning Files - Ordinance #
1249
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />29. <br /> <br />30. <br /> <br />Impact on Infrastructure and Public Services: <br />Will new or expanded utilities, roads, other infrastructure, or public services <br />be required to serve the project? <br />Yes No <br />Centre Pointe Business Park has most required infrastructure in place. The water <br />mains and sanitary sewer were constructed concurrent with the existing internal <br />road system. Minor relocation of infrastructure may be required to accommodate <br />slight differences between the new site layout and the original proposal. All main <br />storm sewer lines are in place. New site-specific storm sewers will be required to <br />direct roof and parking lot drainage to the ponds. <br /> <br />All required external infrastructure is in place and has adequate capacity to serve <br />the project, as documented in responses to previous questions. <br /> <br />If yes, describe the new or additional infrastructure I services needed. (Any <br />infrastructure that is a "connected action" with respect to the project must be <br />assessed in this "EA W"; see "EA W Guidelines" for details.) <br /> <br />Related Developments: Cumulative Impacts: <br />a. Are future stages of this development planned or likely? <br />Yes No <br />The described project represents ultimate site development. Upon <br />completion of the described plan, the entire Centre Pointe Business Park <br />will be developed with the exception of a restaurant site. No outlots or <br />adjacent lands are available for future expansion of the Park; no future <br />stages are planned or likely. <br /> <br />If yes, briefly describe future stages, their timing, and plans for <br />environmental review. <br /> <br />Page 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.