Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />4. Wetlands - No direct impact to wetlands will occur due to the project. Treated <br />site runoff and pretreatment in the regional pond is expected. Adverse ' <br />impacts to the quality of water in the described wetlands due to stormwater <br />runoff from the site are expected to be minimal due to pretreatment of runoff <br />and existing use of the basin for stormwater ponding. <br /> <br />5. Stormwater Management - The Centre Pointe Business Park has been <br />developed with sites meeting the Business Park PUD requirement of25% <br />green space. The 1997 EA W was developed assuming that 25% of the <br />developed area would be green space. The proposed improvements to the <br />Veritas site will result in approximately 28% of the site reserved as green <br />space. The increased green space will result in a reduction of the quantity of <br />surface runoff from this site and ultimately reduce the total runoff identified in <br />the 1997 EA W from the Business Park. In addition to the increased green <br />space, the Veritas site will utilize infiltration areas. These infiltration areas will <br />capture stormwater runoff from the surface parking allowing for the runoff to <br />infiltrate into the ground and sediments to be collected in the infiltration areas. <br />The implementation of the infiltration areas will also result in a reduction in the <br />quantity of runoff from the Veritas site and total runoff identified in the 1997 <br />EAW. <br /> <br />Page 35 <br />