Laserfiche WebLink
<br />D. The equipment platform shall be limited to six equipment cabinets. Five will be 30 <br />inches wide by 40 inches deep by 5 feet tall and one cabinet will be 2 feet wide by 2 <br />feet deep by 5 feet tall. <br /> <br />E. The antenna support units and equipment cabinets shall be limited to the single user <br />(V oiceStream) and the applicant A TP Minneapolis. Future antenna additions will <br />require a revised CUP. <br /> <br />F. The antenna units and equipment cabinets shall not be lighted. Electric and phone <br />wires serving the equipment and antenna units shall be mounted to the building roof. <br /> <br />G. The antenna units, equipment platform, and supporting cabinets shall be completely <br />removed from the site by the applicant (A TP Minneapolis) after operations cease, or if <br />the equipment is damaged or unsafe as determined by the Roseville Building Official, <br />or if the CUP elapses or if the use is determined to be in violation of the CUP or City <br />Code by the Community Development Director. The City may require the applicant <br />(A TP Minneapolis) to post a bond to assure timely removal of the antenna units and <br />supporting equipment. <br /> <br />H. Parking of maintenance vehic1e(s) shall occur in an off-street parking space of the <br />parking lot affiliated with the Roseville Professional Building. <br /> <br />1. The color of the antenna, antenna support units, equipment platform, and equipment <br />cabinets shall be of a similar color (white) to that of the principal structure. <br /> <br />J. This conditional use permit shall expire 6 months after approval if a building permit has <br />not been issued. (Sectiop 1013.03) <br /> <br />5.0 SUGGESTED CITY COUNCIL ACTION <br /> <br />5.1 By motion, approval (approve with modifications or deny) a resolution granting A TP <br />Minneapolis a conditional use permit to allow the installation of three wireless communication <br />antenna (one on north building facade and two free standing on the building roof at the <br />southeast and southwest comers) and an associated equipment platform and cabinet area <br />V oiceStream, at the Roseville Professional Building, 2233 Hamline Avenue North, based on <br />the findings in Section 3 and with the conditions A - J in Section 4 of this report. <br /> <br />Prepared by: Thomas Paschke <br /> <br />Attachments: narrative, site plan, location map, aerial photo, draft PC minutes, and draft CC resolution. <br /> <br />60-Day Schedule: Application accepted on December 12,2000. Decision deadline is February 9, 2001. <br /> <br />PF3284 RCA (012201) - Page 4 of 4 <br />