Laserfiche WebLink
<br />3.5 The equipment cabinet, to be located directly north and east of the penthouse, is also <br />constructed on a galvanized steel platform. This platform rests on the rooftop and is held in <br />place by large weights, The platform rises approximately three feet above the roof and has <br />galvanized steel "fencing" around the platform and the equipment cabinets. Each equipment <br />cabinet is approximately five feet tall and comprised of metal and weather sealed. The <br />equipment platform and cabinets rise approximately eight feet above the roof or seven feet <br />above the building parapet (see attached photos). <br /> <br />3.6 There are currently two other telecommunications providers (Metricom and Implex Systems) <br />that are located on the roof of the Roseville Professional Building. One is a whip antenna and <br />the other is in the form of multiple flush mounted antennas on the penthouse facade. No City <br />poles or private multi-tenant poles that could serve this provider are in this area of the <br />community. <br /> <br />3.7 Conditions may be attached to this CUP that would mitigate the impact on adjacent properties <br />including such items as architectural color and design, materials details, and limiting additional <br />external storage. <br /> <br />4.0 PLANNING COMMISSION CONSIDERATION <br /> <br />4.1 On January 1O, 2001, the Roseville Planning Commission held the public hearing regarding the <br />A TP Minneapolis request. At this meeting a number of adjacent property owners were present <br />to address the Commission on concerns regarding the new antenna and its effect of television <br />reception. <br /> <br />4.2 The applicant, A TP Minneapolis answered the question by indicating that antenna are regulated <br />by the FCC and that they have not experienced a conflict from their antenna in the past. Staff <br />indicated that they would research the adjacent property owner's concerns and report back to <br />the residents Planning Commission and City Council. <br /> <br />4.3 The Commission had additional questions regarding the antenna, equipment platform, and <br />cabinets which A TP Minneapolis answered (see attached minutes). <br /> <br />4.4 The Commission voted (5-0) to recommend approval of the request for a conditional use permit <br />for A TP Minneapolis, subject to the following conditions: <br /> <br />A. The maximum height of the antenna support units and antenna located in the southwest <br />and southeast building comers and north side of the building, upon full installation, <br />shall be eight feet above the roof height. <br /> <br />B. The maximum height of the equipment platform and cabinets, upon full installation, <br />shall be eight feet above the roof height. <br /> <br />C. The A TP request, on behalf of V oiceStream, shall be limited to three antenna support <br />units, each having a maximum of four antennas. <br /> <br />PF3284 RCA (012201) - Page 3 of 4 <br />