My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03292
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03292
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2007 9:58:05 AM
Creation date
12/9/2004 7:03:35 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3292
Planning Files - Type
Conditional Use Permit
Address
2361 HIGHWAY 36 W
Applicant
Verizon Wireless
Status
Approved
Date Final City Council Action
3/26/2001
Planning Files - Resolution #
9876
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />'V <br />,0$/23/01 <br /> <br />14:56 FAX 651 452 5550 _____CAMPBE~L KNUTSON <br />.-.-- <br /> <br />(g}005 <br /> <br />.--.- <br /> <br />.,. <br /> <br />...' <br /> <br />B. The monopole and antenna units cannot be screened. However, the equipment <br />shelter structure can be screened. With proper screeniDg and landscaping, the <br />equipment shelter will not have an impact on surrounding property or values. <br /> <br /> <br />C. There appears to be no impact on general health, safety, and public welfare. <br /> <br />D. The project complies with the Comprehensive Plan designation as a business use. <br /> <br />WHEREAS, on March 14, 2001, the Roseville Planning Commission held the public <br />hearing regarding the Verizon Wireless request and voted (6-0) to recommend approval of the <br />conditional use pennit, subject to the following conditions: <br /> <br />1. The maximum height above grade at the monopole base may be up to 120 feet. Two <br />arrays of antennas ofthe size and pole location specified in the application may be <br />installed on the monopole. <br /> <br />2. The equipment shelter must be erected adjacent to the monopole in the location specified <br />in tbe application and must not exceed 12 feet by 20 feet or 240 square feet in size. All <br />utility wires or lines leading to the monopole from the equipment shelter must be buried. <br /> <br />3. The chain linked fence area surroundiDg the equipment shelter and monopole must be <br />screened. Specifically, plant material must be installed on the south. west, east sides of <br />fenced area and at a minimum height of five feet (except accent shrubs); 75% of this <br />plant screen must be coniferous. A complete landscape plan must be prepared as part of <br />the building pexmit application and approved by the City prior to issuance of the building <br />permit. <br /> <br />4. The monopole is to be limited to the single user/applicant (Verizon Wireless). Future <br />antenna additions will require a revised CUP. <br /> <br />5. The monopole must not be lighted. <br /> <br />6. Electric and phone wires serving the equipment and monopole must be buried. <br /> <br />7. Parking of maintenance vehicles must occur in the off-street parking space directly <br />adjacent to the monopole/equipment shelter location. <br /> <br />8. The 120 foot tall monopole and supporting equipment must be completely removed from <br />the site by the applicant (Verizon Wireless) after operations cease; the equipment is <br />damaged or unsafe as detennined by Bonestroo, Rosene, Anderlik, and Associates, <br />Inc.(property owner); the CUP elapses or is determined to be in viola.tion by the <br />Community Development Director. The City may require the applicant (Verizon <br />Wireless) to post a bond to assure timely removal of the monopole and supporting <br />equipment. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.