Laserfiche WebLink
<br />Member Cunningham suggested that the City should know the probability of <br />what would happen in a catastrophe such as a tornado, a pipe leak, a venting of <br />gas, etc., and how the landlord will plan for this activity. <br /> <br />Mike Marinovich noted there are two 8" walls and 600 feet of horizontal <br />separation from the circuit board manufacturing to the school. The lease <br />transaction does not include the ball fields; the fields may be used while <br />available, but it could be office space and parking in the future. <br /> <br />4.0 STAFF COMMENTS & FINDINGS <br /> <br />In reviewing this item, staff has the following comments: <br /> <br />4.1 The City's Comprehensive Plan map designates this area for "I" (Industrial). <br />The zoning of the site is "1-2" (General Industrial District). The property to <br />the east, north and south is designated for "I" Industrial; to the west is the <br />City of Minneapolis Gross Golf Course a "PI" Park Open Space Use. There <br />are no major use conflicts on adjacent sites; most uses are office, computer <br />related activities or warehouses and trucking. <br /> <br />4.2 The City's Comprehensive Plan text indicates that mixes of uses may be <br />appropriate, should be judged on their own merits and ifthey redevelop, and <br />should be done through the Planned Unit Development Process. <br /> <br />4.3 In conjunction with the application for concept development plan approval, <br />the following documents have been submitted and reviewed by staff in <br />preparation of this report: <br /> <br />a. Concept site plans and inventories of the site <br />b. Letters of Support from the Charter School and Sponsor <br />c. Other background! Applications <br /> <br />4.4 A package of existing plans and proposals for improvements or changes <br />must be submitted to and approved by the City prior to a decision on the <br />final development plan. These plans become part ofthe PUD. The applicant <br />must include in the final documents ofthe PUD, the methods and annual <br />stages of improvements (up to 2 annual school building stages: year 2001 <br />and 2002). The site will be brought into compliance with the current <br />building and fire codes as much as possible, as well as paving corrections <br />and improvements, fencing, screening, lighting and layout of playground <br />equipment, traffic and traffic signage improvements for the school areas and <br />safety drop-off zones for children, screening of new trash and new rooftop <br />HV AC and signage updates. The school use is considered a minor "H-7" <br />use within the larger building and cannot exceed more than 1 0% of the <br />building area. <br /> <br />4.5 Future uses such as schools, pre-school and day care operations should be <br />considered as conditional uses (requiring a separate hearing and approval) <br />within the new PUD zone because of their focus on mixes of industrial, <br />office, and school children or the assembly, parking, and hours of operation <br />issues. Those uses proposed or existing at the time of this application should <br />PF3301 RPCA (050901) - Page 6 of9 <br />