Laserfiche WebLink
<br />VI Project Purpose (Details) <br />Prqject # 1 Within Walsh Lake <br /> <br />Install an improved water pumping station manufactured by Flowtronics. A complete <br />pumping station capable of total computerized water and irrigation control, monitoring <br />exactly what each zone and each head within the zone is using for water and when it is <br />used. With a computer within the system, recording on disc and on paper all amounts <br />used at all times. The pump station is capable of pumping from a minimum of 20 gallons <br />per minute to 2000 gallons per minute. The amount of water used will be more efficient <br />. throughout the entire golf course. Having more water to pump at a given time shortens <br />the total time of pumping, which will enable all the turf to be watered during the night <br />and completed by morning. All pumps are variable speed, which make them more energy <br />efficient. This system is a state of the art system. <br />