Laserfiche WebLink
<br />VI Project Purpose (Details) <br />Project #2 Within Walsh Lake <br /> <br />Repair and reclaim the eroded shoreline, as per the drawing attached. <br /> <br />Installing one of two options: <br /> <br />1. Vinyl sheet piling (Minimal panel exposed) <br />2. Rip-rap as per drawing (Minimal rock exposed) <br /> <br />Commepts: <br /> <br />Vinyl sheet piling is the preferred option. There is minimum soil and minimum overall <br />impact to install the vinyl sheet piling. There is no silt entering the water and the muskrat <br />or bank rat control is far superior to rip-rap with fabric. <br />