Laserfiche WebLink
<br />_ Request for Ame1Jdment to PUD <br />Solut(a-Roseville-' ,.' ' <br /> <br />. '..' '~, <br /> <br />August 6; 2001 <br />Pag~ 4 of 7' ' <br /> <br />" <br /> <br />Construction of the proposed siteimproveme~t,~'wiH begin 'in 2002..', <br /> <br />SITE IM:PROVEME~TS <br /> <br />Parkin!!: SoIut'ia C~msulting'~parking requirements for the site differs from' City <br />standards: Sol~tia's requirem~ntsare 5 parking spaces per 1000 S.F.,of net building <br />area. The City's requiremen~ is 5 parking spaces per 1000 S.F. of gross building area. <br />S.olutia's needs are based on the number of employees that will be located on the' <br />campus. The net building area for the building is 17 ,495S.F., which gener~tes a <br />p~rking needof88 parking spaces, . , <br /> <br />Sanitary Sewer: Based on' anticipated sanitary sewer flo~s from this type of use, the <br />existing sanitary sewer system is adequately size4. The future buildingswiil <br />di~charge into the sanitary sewer system located 'in Centr~ Pointe DriVe. It is our <br />understan4ing that the CitY of Roseville is 'studying the,sewershed t<;>deteimine if <br />improvements to the, existing downstream lift station are necessary. ' , <br /> <br />.. <br /> <br />.' <br /> <br />Watermain: Water service will be provided to. the building from t4e 12"main <br />looped through the site during Phase 1cohstruction, Based on the size 'of the existing <br />water main located in Centre PointeDriVe, adequate water supply is available. ' ' <br /> <br />, ' <br /> <br />Storrtt Sewer: St~rm water run off from the Site will be co~sistent with the <br />approved master plan.' AU surface water will be collected ,at low points 'and carried <br />, via storm sewer to the retention basin located-along the south property lin~: <br /> <br />. ' <br /> <br />Gr'adin!!: The Site will be graded according to the approved master,plan. <br />, DistUrbance to existing site grades will be required to bring in additional soil. MPCA <br />Best Management Practices will be implemented to minimize site erosion and <br />impacts to' the surrounding environment.' <br /> <br />SITE LANDSCAPING, LIGH1;'ING AND TRAILS " <br />, The proposed site design wjil preserve the pond south ofthisparcel. The pond will b,e the <br />focal point oftheproject's:;ite design. Additionally,)andscape amenities will be added to <br />, complement and re-affirm the distinctive natural setting. 'A greenway trail system will be <br />retained along the westerly property line to naturally weave the natural setting to the bUIlt. <br />, environment C;lnd to providG passive recr~ationaI opportunities for workers and residents ,,' <br />alike:' An entrance plaza landscape ,with tress and benches will provide a distinctive, entrance <br />to the building: A patio near the pond will provide eJIlployees with a place,to take a break <br />and enjoy lunch.' , ' '. <br /> <br />Lighting will be provided that meets tbe se~urity requirements of employees. Additionally;' <br />the lighting will be designed to red~ce glare and light pollution on the surrounding properties, <br />a!1d roads. ,This feature will pr~)Vide, distinctive and vaIue-enhancin,g amenities, for the <br />projec~~ <br /> <br />The folloWing chart coinp~res the development standards -f()f Solutia Consulting,- Software as <br />they relate to the approved pub design ~tandards. . <br />. . '_ 'J , . <br /> <br />. ' <br />