My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03338
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:29:43 PM
Creation date
12/9/2004 7:26:11 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3338
Planning Files - Type
Planned Unit Development
Address
3015 CENTRE POINTE DR
Applicant
CENTRE POINTE/SOLUTIA
Status
Approved
PIN
052923110037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Water mains, storm and sanitary sewers, and on-site and regional stormwater <br />ponding areas are all designed to service the site. Centre Pointe Solutions proposes <br />to utilize the existing storm water ponding system, which currently exists. <br /> <br />The proposed building will be two-stories tall, which is permitted within the original <br />PUD, When fully developed, the total area of all buildings in Centre Pointe Business <br />Park will be 819,000 SF, plus the 120,000 SF built by Woodbridge pursuant to the <br />1985 approval by the City of Roseville, <br /> <br />The construction schedule for the project is estimated to occur over the next two <br />years. During this time, noise from construction equipment and construction dirt and <br />dust will need to be controlled. Minnesota Best Management Practices will be <br />followed to minimize the impact of construction and control erosion, <br /> <br />c, Explain the project purpose; if the project will be carried out by a governmental <br />unit, explain the need for the project and identify its beneficiaries, <br /> <br />The project will allow Solutia Consulting to construct their corporate headquarters. <br />Solutia Consulting has been searching for over a year for a site that is centrally <br />located for their employees and customers. The Centre Pointe site meets their needs. <br /> <br />d. Are future stages of this development including development of any outlots planned <br />or likely to happen? Yes No If yes, briefly describe future stages, relationship to <br />present project, timeline and plans for environmental review, <br /> <br />No, there are not any future stages planned or likely. <br /> <br />e, Is this project a subsequent stage of an earlier project? Yes No If yes, briefly <br />describe the past development, timeline and any past environmental reviews <br /> <br />Please refer to the response to Question 6b for a complete description of past <br />development. <br /> <br />7. Project magnitude data <br />Total project acreage: 47.6 acres (1.4 Acre Centre Pointe Solutions Site) <br />Number of Residential Units: unattachedN/A attachedN/A maximum units per building <br />N/ A. No residential units will be constructed <br />Commercial, industrial or institutional building area (gross floor space): total square feet <br />819,000. <br />Indicate area of specific uses: <br /> <br />Environmental Assessment Worksheet <br />Centre Pointe Business Park <br /> <br />Page 7 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.