Laserfiche WebLink
<br />On February 10, 1986, following the mandatory EA W comment and review <br />process, the Roseville City Council passed Resolution 7861-Finding of a Negative <br />Declaration for a Full Environmentallmpact Statement-Centre Pointe Business <br />Park project. <br /> <br />.. <br /> <br />Following the approval and in accordance with the approved plan, all identified <br />environmental hazards were removed, all required permits were obtained and the <br />site was mass-graded in preparation for the development. In addition, two public <br />roads (Lydia Avenue and Centre Pointe Drive) storm sewer, water mains, sanitary <br />sewer, and eight stormwater ponds were installed to service the site. <br /> <br />Due to relatively low demand for office space, only 2 ofthe 12 lots approved in <br />the 1985 plan were built. These 2 lots currently contain 120,000 SF of office <br />space. <br /> <br />In 1997, Ryan proposed to develop the remaining ten lots, replatting them to <br />create two additional lots (see 1997 Master Site Plan, Figure 5A). The proposed <br />uses included two business hotels, two sit-down restaurants, five office buildings, <br />two office-showrooms, and one office-manufacturing for a total of619,000 SF. In <br />1997 an EA W was prepared and a negative declaration adopted by the City of <br />Roseville for the Centre Pointe Business Park as summarized above. <br /> <br />In February 2000 a minor administrative amendment permitting an increase in the <br />building area by 10% was approved by the City of Roseville. The south 16 acres <br />of Centre Pointe Business Park were then sold to Veritas and Veritas commenced <br />construction on Veritas Building 1. In the summer of 2000, the PUD was <br />amended to allow construction of a third hotel in place of an office building <br />within Centre Pointe. In April of2001, the PUD and EA W was amended to allow <br />an increase of 122,000 S.F. of office space for the Veritas Campus. The following <br />chart summarizes the approvals for the Centre Pointe project. <br /> <br />Centre Pointe Planned Unit Development Sta!!:es of Approval <br /> <br />Centre Pointe PUD 1985 1997 1999 2000 2001 <br />Woodbridge PUD 647,000 S.F. <br />Woodbridge - Built 120,000 S.F. 120,000 S.F. 120,000 S.F. 120,000 S.F. <br />Ryan PUD 619,000 S.F. 619,000 S.F. 619,000 S.F. 619,000 S.F. <br />Adm. Amendment (10%) 61,900 S.F. 61,900 S.F. 61,900 S.F. <br />CSM Hotel PUD Amend, 3rd Business Hotel <br /> (no simif, S,F. added) <br />Veritas PUD Amend. 122,000 S.F. <br />Prop. Centre Pointe 15,500 S.F. <br />Solutions Amend. <br />Proposed PUD 647,000 S.F. 793,000 S.F. 800,000 S.F. 800,000 S.F. 937,500 S.F. <br /> <br />Page 5 <br />