My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03338
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:29:43 PM
Creation date
12/9/2004 7:26:11 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3338
Planning Files - Type
Planned Unit Development
Address
3015 CENTRE POINTE DR
Applicant
CENTRE POINTE/SOLUTIA
Status
Approved
PIN
052923110037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />19. Water Quality - Waste Waters: <br />a. Describe sources, quantities, and composition (except for normal <br />domestic sewage) of all sanitary and industrial wastewater produced <br />or treated at the site. <br /> <br />This site is proposed as a typical office building. This uses produce <br />normal domestic sewage. <br /> <br />b. Describe any waste treatment methods to be used and give estimates <br />of composition after treatment, or if the project involves on-site <br />sewage systems, discuss the suitability of the site conditions for such <br />systems. Identify receiving waters (including ground water) and <br />estimate the impact of the discharge on the quality of the receiving <br />waters. (If the runoff may affect a lake consult "EA W Guidelines" <br />about whether a nutrient budget analysis is needed.) <br /> <br />No onsite waste treatments are expected with these proposed uses. <br /> <br />c. If wastes will be discharged into a sewer system or pretreatment <br />system, identify the system and discuss the ability of the system to <br />accept the volume and composition of the wastes. Identify any <br />improvements, which will be necessary. <br /> <br />Sanitary sewer will be handled by the existing City of Roseville system. <br />Typical wastewater flow rates from general office uses are 274 gallons per <br />2,900 square feet per day. Total flow rate for the Centre Pointe Solutions <br />site would be approximately 2,031 gallons/day. Total flow rate for Centre <br />Pointe Development will be 77,381 GPD. Existing 8" and/or 10" sanitary <br />sewers exist in Centre Pointe Drive, Lydia Avenue and Cleveland Avenue. <br />These gravity lines flow to a lift station located about 600' north of Lydia <br />Avenue, on the west side of Cleveland Avenue. This lift station was <br />upgraded in 1987 to handle all flows from the Centre Pointe development. <br />The sewer lines are centrally located and will collect efficiently from the <br />site. All of the sewer lines ultimately reach the trunk line in lona Lane, <br />then proceed onto the Metro Treatment Plant in St. Paul. <br /> <br />Page 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.