My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03338
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:29:43 PM
Creation date
12/9/2004 7:26:11 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3338
Planning Files - Type
Planned Unit Development
Address
3015 CENTRE POINTE DR
Applicant
CENTRE POINTE/SOLUTIA
Status
Approved
PIN
052923110037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />15. Water surface use. Will the project change the number or type of watercraft on any water <br />body? Yes No <br />If yes, indicate the current and projected watercraft usage and discuss any potential <br />overcrowding or conflicts with other uses, <br /> <br />No recreational surface waters are present on the site. <br /> <br />16. Erosion and sedimentation. Give the acreage to be graded or excavated and the cubic yards <br />of soil to be moved: acres ->' cubic yards--"- Describe any steep slopes or highly erodible <br />soils and identifY them on the site map, Describe any erosion and sedimentation control <br />measures to be used during and after project construction. <br /> <br />Improvements to the site wil1 not require significant grading. The site has already been mass <br />graded as part of improvements to the Business Park in 1997. An erosion control plan is not <br />required for review by the Watershed District due to the acreage to be distributed. <br /> <br />No steep slopes are located on the property. Minimal potential for problem erosion exists. <br /> <br />The Solutia site was graded to pad elevations during mass grading in 1997. Grading, utility, <br />street and drainage pond construction has been completed. The earthwork required to final <br />grade the site will be minimal. <br /> <br />It is anticipated that during site grading, existing topsoil will be stockpiled and later re- <br />applied in the landscape areas. The remaining ground will need to be adjusted to final grade <br />with proper soil preparation to support the buildings and parking lots. <br /> <br />Standard practices for erosion control will be followed for this site. Anticipated BMP's are: <br />Rock Entrance to minimize soil tracking on the roadways from vehicle traffic; silt fence / hay <br />bale interception to keep silt and fine soils from eroding off-site and onto hard surfaces; <br />storm sewer inlets will be screened to minimize the loss of soil into the existing and <br />proposed storm structures. Although reviewed by the watershed is not required, final <br />grading plans will meet or exceed the Rice Creek Watershed District requirements for <br />erosion control. <br /> <br />17. Water quality: surface water runoff <br />a. Compare the quantity and quality of site runoff before and after the project, <br />Describe permanent controls to manage or treat runoff Describe any stormwater <br />pollution prevention plans. <br /> <br />The Centre Pointe Business Park has been developed with sites meeting the Business <br />Park PUD requirement of 25% green space. The 1997 EA W was developed <br />assuming that 25% of the developed area would be green space. The proposed <br />improvements to the Solutia site will exceed the minimum green space requirements <br />of 25%. <br /> <br />Environmental Assessment Worksheet <br />Centre Pointe Business Park <br /> <br />Page 13 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.