My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03338
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:29:43 PM
Creation date
12/9/2004 7:26:11 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3338
Planning Files - Type
Planned Unit Development
Address
3015 CENTRE POINTE DR
Applicant
CENTRE POINTE/SOLUTIA
Status
Approved
PIN
052923110037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />If yes, describe the new or additional infrastructure / services needed. (Any <br />infrastructure that is a "connected action" with respect to the project must be <br />assessed in this "EA W"; see "EA W Guidelines" for details.) <br /> <br />30. Related Developments: Cumulative Impacts: <br />a. Are future stages of this development planned or likely? <br />Yes No <br /> <br />The described project represents ultimate site development. Upon <br />completion of the described plan, the entire Centre Pointe Business Park <br />will be developed with the exception of a restaurant site. No outlots or <br />adjacent lands are available for future expansion of the Park; no future <br />stages are planned or likely. <br /> <br />If yes, briefly describe future stages, their timing, and plans for <br />environmental review. <br /> <br />b. Is this project a subsequent stage of an earlier project? <br />Yes No <br />If yes, briefly describe the past development, its timing, and any past <br />environmental review. <br /> <br />In 1997 as amended through April of2001, Centre Pointe has been <br />approved for the construction of 803,500 square feet. The current <br />proposal is not a subsequent stage of an earlier project. Rather, the current <br />proposer seeks to complete a project first proposed more than eleven years <br />ago. In 1985, Woodbridge Properties, Inc. proposed constructing Centre <br />Pointe Business Park in Roseville. Supporting infrastructure for Centre <br />Pointe Business Park (internal roads, stormwater ponds, and utilities) and <br />a majority of the buildings are built or under construction. The Centre <br />Pointe Solutions office building will complete Centre Pointe by providing <br />some additional office space, which will meet the growth demand for an <br />environmentally friendly user in addition to the already constructed hotels, <br />restaurants, office/showrooms, and office/manufacturing in Centre Pointe. <br /> <br />c. Is other development anticipated on adjacent lands or outlots? <br />Yes No <br /> <br />The boundaries of Centre Pointe are 1-35W to the west, Cleveland Avenue <br />to the east, County Road D to the north and DNR Wetland 50W and <br />County Road C to the south. Adjacent lands are currently developed or <br />undevelopable (i.e.: roads, wetlands). There are no adjacent outlots <br />platted. No future development is anticipated on adjacent lands. <br /> <br />Page 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.