Laserfiche WebLink
<br />3. Dust, Odors, Noise - Some dust will be generated during construction, dust will be <br />minimized by various means as described in Item 25. The project will not generate <br />significant odors. Noise impacts during construction may exceed state noise standards <br />for a limited period of time; every effort will be made to reduce construction noise. <br />Predicted noise levels from traffic appear to be moderately lower than the current <br />existing conditions. <br /> <br />4. Wetlands - No direct impact to wetlands will occur due to the project. Treated site <br />runoff and pretreatment in the storm water pond is expected. Adverse impacts to the <br />quality of water in the described wetlands due to stormwater runoff from the site are <br />expected to be minimal due to pretreatment of runoff and existing use of the basin for <br />stormwater ponding. .. <br /> <br />5. Stormwater Management - The Centre Pointe Business Park has breri developed with <br />sites meeting the Business Park PUD requirement of 25% green space. The 1997 EA W <br />.was developed assuming that 25% of the developed area would be green space. The <br />proposed improvements to the Centre Pointe Solutions site will result in meeting the <br />25% greenspace requirement. The green space will result in a reduction of the quantity <br />of surface runoff from this site and ultimately reduce the total runoff identified in the <br />1997 EA W from the Business Park. <br /> <br />RGU CERTIFICATION. The Environmental Quality Board will only accept SIGNED <br />Envirott111.ental Assessment Worksheets/or public notice in the EQB Monitor. <br />I hereby c~ttify that: <br />· The information contained in this document is accurate and complete to the best of my <br />knowledge. <br />· The EA W describes the complete project; there are no other projects, stages or <br />components other than those described in this document, which are related to the project <br />as connected actions or phased actions, as defined at Minnesota Rules, parts 4410.0200, <br />subparts 9b am;! 60, respectively. <br />· Copies o/this EAW ate being sent to the entire EQB distributiQn list. <br /> <br />Signa/w'e~ ~~-' . Date.n..~." .'2=1 <br />Title ~~/1e ~wt~~ ~p~ n~ <br /> <br />Environmental Assessment Work$heet was prepared by the staff of the. Environmental Quality Board ~t Minnesota <br />Planning. Foraddiiional information, worksheets or /or EAWGuidelines, contact: Environmemal Quality Board, <br />658 Cedar St., St. Paul, MN 55155, 651"296-8253, Qr www.mnplan.state.IJID.115 Revised 2/99 <br /> <br />Environmental Assessment Worksheet <br />Centre Pointe Business Park <br /> <br />Page 29 of 29 <br />