My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03338
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3300
>
pf_03338
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:29:43 PM
Creation date
12/9/2004 7:26:11 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3338
Planning Files - Type
Planned Unit Development
Address
3015 CENTRE POINTE DR
Applicant
CENTRE POINTE/SOLUTIA
Status
Approved
PIN
052923110037
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
466
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Centre Pointe Planned Unit Development Sta2:es of Approval <br /> <br />Centre Pointe PUD 1985 1997 1999 2000 2001 <br />Woodbridge PUD 647,0000 s.f. <br />Woodbridge -Built 120,000 s.f. 120,000 s.f. 120,000 s.f. 120,000 s.f. <br />Ryan PUD 619,000 s.f. 619,000 s.f. 619,000 s.f. 619,000 s.f. <br />Adm. Amendment 10%) 61,900 s.f. 61,000 s.f. 61,900 s.f. <br />CSM Hotel PUD Amend. 3rd Business Hotel <br /> (no signif. s,f. added) <br />Veritas Exp.PUD Amend 122,000 s.f. <br />Solutia Amendment 15,240 s.f. <br />Approved PUD 647,000 s.f. 739,000 s.f. 800,300 s.f. 802,500 s.f. 938,140 s.f. <br /> <br />1.4 The original Centre Pointe Master Site Plan for the 61,000 s.f. vacant parcel showed a <br />6,000 square foot building footprint for a restaurant. The new proposal would add 4,620 <br />square feet to the first floor footprint and a 10,620 square feet second floor. Therefore, <br />new office building coverage of the parcel totaling 15,240 square feet would occur. <br /> <br />1.5 To reduce parking lot coverage ofthe parcel and allow for 25% landscaped area, Solutia <br />Consulting proposes a parking structure to be built under the building for 30+ vehicles. <br />As proposed, construction would occur in 2002. <br /> <br />1.6 The text for the PUD indicates that the first choice of a permitted use is a sit-down <br />restaurant and that a second choice of a permitted use is an office building. Specifically <br />Section 7.2 reads: The uses shall be restricted to those specified in the site plan and <br />supporting documents including office, office/showroom, office/manufacturing, 2 hotels, <br />and 1 restaurant within the Centre Pointe Business Park Plan. If either of the hotels or <br />the restaurant are not built, the lots/sites for those uses on the approved land use/site <br />plans shall be used for office, office/showroom, or office/manufacturing uses per Exhibit <br />E-2. <br /> <br />1.7 The major change for the Master Site Plan (a drawing) is changing the identified use <br />from restaurant to office and adding approximately 4,000 square feet of "footprint" on <br />the 6,000 square foot building pad. <br /> <br />1.8 The major change for the PUD Agreement (written ordinance) is increasing the building <br />dimensions for that particular lot. <br /> <br />PF 3338 - RCA (12/17/01) - Page 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.