Laserfiche WebLink
<br />,07/08/93 13:52 <br /> <br />U612 337 5601 <br /> <br />DSU. INC. <br /> <br />III 004/009 <br /> <br />Rick Jopke <br /> <br />7/8/'3 <br /> <br />page I <br /> <br />motel site meets the applicable siqnaqe size standards. <br /> <br />6. That the new public street be named Lincoln Drive, not South <br />CampU5 Drive. <br /> <br />~t is shown as Lincoln Drive on the submitted preliminary plat. <br /> <br />7. !"bat additional landscaping be provided at the rear oZ the <br />Assisted Uving Building and on the north side or the loading <br />clock area, to be reviewed find approved by city starf. <br /> <br />The landscape plan, as revised for these areas, is acceptable. <br /> <br />B. 2'bat: the mot:e~ sl te plan be approved only if tbere is <br />agreement in writing from tbe owners ot Benjamin's on the <br />common acce55 driveway. Otbe,nr1se tl1e plan Jbust be modified <br />to accommodate al.l access and required parking on the motel <br />site with proper setbacks. <br /> <br />We have a letter from the owner of the Benjamin's property <br />indicating his approval of the proposed site plan. The access into <br />Benjamin's and the motel site also fits with the, proposed design of <br />Lincoln Drive and County Road C-2. <br /> <br />if. 9. <br /> <br />~bat: a permit be obtained trom Rice Creek Watersbed District <br />for the drainage pl an . <br /> <br />The applioant has submitted information to RCWD, but has not asked <br />for a formal approval because the City's work in County Ditch No. 4 <br />will also impact the drainaqe situation, and the City project is <br />not yet complete and ready to be submitted. The Public Works <br />Department approves of the design for drainage and RCWD staff has <br />indicated that the information they have received is adequate. We <br />believe it is appropriate to grant Final PUD approval with the RCWD <br />approval still p~dinq, but withhold final building permits for ~e <br />drainage work until RCWD has granted the permit. ~t should be <br />clear that it is the applicant's responsibility to satisfy the RCWD <br />for the South Campus project and the city is not liable for any <br />additional in~ormation or work the RCWD may require for their <br />project. <br /> <br />'7, ~o. f'hat the final plans Lor the 36 unit .t'uture phase o~ senior <br />housing in the northwest corner o~ the sl1:e be deBi9Ded <br />essentia.l~y as shmrn on the PUD si te plan. !'bis means that <br />the use will be Lor senior housing with soJlte assisted care <br />provided; 1:hat there wIll be adequate parki~~ in the location <br />shawn; that the building will be one story and essentially of <br />the sise and looation shown; and 1:hat the desig'l1 find <br />arohitec:tural oharacter ot the buildings be compatible with <br />