My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03232
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3200
>
pf_03232
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 1:50:39 PM
Creation date
12/14/2004 6:27:23 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3232
Planning Files - Type
Planning-Other
Project Name
TWIN LAKES
Applicant
CITY OF ROSEVILLE
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1764
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />REQUEST FOR COUNCIL DISCUSSION <br /> <br /> <br />ent Approval: <br />tb <br /> <br />Item Description: Update on Twin Lakes Master Plan Renewal Strategy Process (PF3232) <br /> <br />Manager Approved: <br /> <br />DATE: 11/20/00 <br />ITEM NO: 8 <br />Agenda Section: <br /> <br />1.0 BACKGROUND <br /> <br />1.1 As discussed at the Council work sessions in June and October, the proposed <br />Twin Lakes Master Plan Renewal process should achieve the following: <br /> <br />1.1.1 evaluate and update the original 1988 Master Plan; <br />1.1.2 incorporate the amendment in 1996 based upon the Twin Lakes Parkway; <br />1.1.3 evaluate changes in the Business Park market <br />1.1.4 ensure that redevelopment will maximize the City's current and future <br />investment policies and strategies <br />1.1.5 evaluate the environmental impacts based upon the amended master plan <br />through an Alternate Urban Area-Wide Review (AUAR) which is an <br />acceptable process by the Environmental Quality Board per Section <br />4410.3600 of the regulations for environmental review of development <br />areas. The content and form of the AUAR must be similar to an <br />Environmental Assessment Worksheet with the level of analysis <br />comparable to an Environmental Impact Study. <br />1.1.6 collaborate with the I-35W Coalition build out plans and other state and <br />county agencies plans to strengthen linkages among Jobs, Transportation, <br />and Housing. <br />1.1.7 evaluate future land uses and identify the costs, returns and impacts for the <br />community and the entire I-35W Corridor. <br /> <br />1.2 It is critical that new development within Twin Lakes complements (as much as <br />possible) the uses and public investments in other Roseville redevelopment areas <br />such as Gateway, Patton Road, CSM-Gateway West, Tower Place, and Centre <br />Pointe. <br /> <br />1.3 Staff is hopeful that a renewed plan with the background detail completed to <br />support it would position the City to more realistically capture another corporate <br />expansion project(s) and provide the framework for a more practical mixed-use <br />business park. <br /> <br />PF3232 - RCD(112000) Page I of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.