Laserfiche WebLink
<br /> <br />Table 2A - Twin Lakes Parkway <br />Phase One - Roadway Construction <br />Seq. MnDOT Unit <br />No. No. Item Unit Qty. Price Amount <br />1 2021.501 Mobilization LS $ 15,600.00 $ 15,600.00 <br />2 2101.501 Clearing Acre 1.18 $ 5,000.00 $ 5,900.00 <br />3 2101.506 Grubbing Acre 1.18 $ 5,000.00 $ 5,900.00 <br />4 2104.501 Miscellaneous Removal LS 1 $ 2,500.00 $ 2,500.00 <br />5 2105.501 Common Excavation CY 4000 $ 4.50 $ 18,000.00 <br />6 2105.522 Select Granular Borrow CY 2150 $ 10.00 $ 21,500.00 <br />7 2211.501 Agg. Base Class-V Ton 1000 $ 10.00 $ 10,000.00 <br />8 2350 Bituminous Base Ton 480 $ 40.00 $ 19,200.00 <br />9 2350 Bituminous Binder Ton 480 $ 42.00 $ 20,160.00 <br />10 2350 Bituminous Wear Ton 480 $ 45.00 $ 21,600.00 <br />11 2357.502 Bituminous Tack Coat Gal 500 $ 1.50 $ 750.00 <br />12 2531.501 Cone. Curb and Gutter LF 2000 $ 8.00 $ 16,000.00 <br />13 2464.601 Signing and Striping LS 1 $ 4,000.00 $ 4,000.00 <br />14 Traffic Control LS 1 $ 7,000.00 $ 7,000.00 <br />15 2575.501 Sodding w/4" Topsoil SY 1220 $ 4.00 $ 4,880.00 <br />16 2575.501 Seeding w/4" Topsoil Acre 0.9 $ 1 ,000.00 $ 900.00 <br />17 2573.502 Silt Fence LF 600 $ 5.00 $ 3,000.00 <br />18 2573.501 Bale Check EA 80 $ 6.00 $ 480.00 <br />19 Traffic Signal at LS $ 150,000.00 $ 150,000.00 <br /> Cleveland Avenue <br /> Subtotal $ 327,370.00 <br /> Design and Administrative Costs @30% $ 98,211.00 <br /> Contigencies @ 1 0% $ 32,737.00 <br /> Total Estimated Costs $ 458,300.00 <br /> <br /> <br /> <br />