Laserfiche WebLink
<br /> <br />Table 28 - Twin Lakes Parkway <br />Phase One - Roadway Enhancements <br /> <br /> <br />Seq. MnDOT <br />No. No. <br />1 <br /> <br />Item <br />Street Lights @ 150' OC <br />Including Wiring & Feed <br />Points <br /> <br />Unit <br />EA <br /> <br />Qty. <br /> <br />Unit <br />Price Amount <br />10 3200 $32,000.00 <br /> <br /> <br />2 Street Trees, 3" Cal. EA 32 350 $11,200.00 <br /> @ 60' O.C., Boulevards and Median <br />3 10' Bituminous Walk wi Concrete LF 660 28 $18,480.00 <br /> Edge Strips <br /> Subtotal $61,680.00 <br /> Design and Administrative Costs @30% $18,504.00 <br /> Contigencies @ 1 0% $ 6,168.00 <br /> Total Estimated Costs $86,400.00 <br /> <br />