Laserfiche WebLink
<br />Table 2C - Twin Lakes Parkway <br />Phase One - Water Main Construction <br /> <br /> <br />Seq. MnDOT <br />No. No. Item Unit <br />1 2504.602 Remove and Relocate EA <br />Existing Hydrant <br /> <br />Qty. <br /> <br />Unit <br />Price Amount <br />1 4000 $ 3,500.00 <br /> <br />Subtotal <br /> <br />$ 3,500.00 <br /> <br />Design and Administrative Costs @30% <br /> <br />$ 1,050.00 <br /> <br />Contigencies @ 1 0% <br /> <br />$ 350.00 <br /> <br /> <br />Total Estimated Costs <br /> <br />$ 4,900.00 <br /> <br /> <br />