Laserfiche WebLink
<br />Planned Unit Development process that include the uses and land use restrictions designated in <br />section 1005.07 (B-6 zone) of the Roseville City Code <br /> <br />4.2 The zoning designation that best suits the properties within Twin Lakes Master Plan area and its <br />proposed future uses is the Mixed Use Business Park, "B-6" zone, which has a mix of office, <br />medical facilities, hotels, financial services, health clubs, service/support retail and multi family <br />housing. <br /> <br />4.3 The "B-6" zone is meant to provide redevelopment flexibility through a mix of compatible uses <br />and site planning requirements and techniques. This "B-6" zone uses a PUD to implement the <br />Twin Lakes Master Plan and environmental mitigations. Each redevelopment must have an <br />adopted Planned Unit Development. (In Twin Lakes, the City has already completed the master <br />planning and the environmental impact work to speed up the process of redevelopment.) <br /> <br />4.4 The "B-6" zone has an expanded Floor-to-Area ratio of up to .75, which encourages multi-story <br />buildings. The maximum number of stories above grade is five (or seventy feet) whichever is <br />less. This allows for building masses similar to the Veritas Headquarters in Centre Pointe. The <br />setbacks from property lines increase with the height of the building. A minimum of25% of the <br />surface area must be "green" landscaped. Ponding on site must be designed as an amenity on <br />the site. <br /> <br />4.5 By approving the "B-6" rezoning, the City will officially bring the Twin Lakes Master Plan <br />proposed future uses into conformance with the Comprehensive Land Use Plan and the Zoning <br />Ordinance. <br /> <br />5.0 POLICY & FISCAL IMPLICATIONS <br /> <br />5.1 Public input into this process has been significant. The approval of the Twin Lakes Master Plan <br />was a culmination of two years of neighborhood meetings; focus group sessions with <br />developers, public agencies and property owners; implementation of Federal and Metropolitan <br />Council grants; study of various land use options; environmental review through and Alternate <br />Urban Areawide Review (AUAR) and several public hearings with the Planning Commission <br />and City Council. <br /> <br />5.2 Making the zoning designation consistent with the comprehensive plan designation is required <br />by State Statutes. <br /> <br />5.3 No fiscal implications are apparent at this time. However, redevelopment within the Twin <br />Lakes Master Plan area consistent with the B-6 zoning could generate an estimated $300 <br />million in new property investment, 5,000 in new jobs and more than 500 new housing units. <br /> <br />5.4 Inconsistent land use such as heavy industrial or truck uses adjacent to office and residential <br />uses tend to the stagnate property values as well as interest in reinvestment redevelopment of <br />surrounding properties. <br /> <br />5.5 Allowing the properties within Twin Lakes to expand with current industrial and trucking uses <br />would delay the policy and fiscal goals identified in the Twin Lakes Master Plan and supported <br /> <br />PF3359 - ReA B-6 Rezone Twin Lakes (061702) Page 4 of 5 <br />