Laserfiche WebLink
<br />III. Capital Costs <br /> <br /> <br />Included in the following capital cost summary tables are revised cost estimates <br />for items in the 1996 Twin Lakes Business Park Comprehensive Plan. Appendix <br />B includes the capital cost summary, detailed cost breakdowns are included in <br />tables 2 through 13 in Appendix B. The cost estimates are based on the concept <br />plans presented in the 1996 Twin Lakes Business Park Comprehensive Plan <br />except for the changes noted in this report and will need to be refined at the time <br />more detailed plans are prepared. <br /> <br />Costs for acquisition of right of way for the roadways and enhancements has not <br />been included in this cost estimate. <br /> <br /> <br />Twin Lakes Business Park Master Plan - Update of September 30, 1996 Report <br /> <br />5 <br />