Laserfiche WebLink
<br />e. Provision of a fire alarm system with strobe lights in each of the four classrooms. <br /> <br />f. The modular classroom building be skirted and include a ramp for handicapped <br />access. <br /> <br />g. The temporary modular classroom structure and the previously approved <br />temporary modular office structure must be painted to blend with the brick <br />exterior of Advent Lutheran Church. <br /> <br />h. All trash and recycling containers shall meet Section 1010.11 C of the Roseville <br />City Code. <br /> <br />i. Jt:#det\;rmirred~t@~.berequired"by.tRelJl'fifo <br />must provide portable restroom facilit' <br /> <br /> <br />j. The Interim lJse Permit being null and void after 6 months should Family <br />Academy not receive the necessary permits through the Roseville Community <br />Development Department. <br /> <br />k. The Interim lJse Permit and any extension are subject to any conditions <br />recommended by the Commission and approved by the Council. <br /> <br />7.0 SUGGESTED PLANNING COMMISSION ACTION: <br /> <br />7.1 By motion, recommend approval (approval with modifications or denial) of a 36 <br />month interim use permit for Family Academy Charter School and Advent <br />Lutheran Church (P.F. 3392) to allow a temporary 56 foot by 72 foot (4,032 sq. ft.) <br />modular classroom south of the existing school, based on the findings of Section 5, <br />the conditions in Section 6 of the project report dated 6/5/02, and with an expiration <br />date of June 30, 2005. <br /> <br />Prepared by: Thomas Paschke (490-2236) <br /> <br />Attachments: Narrative, location map, site plan, and aerial photo. <br /> <br />PF3392 - RPCA 060502 - Page 4 of 4 <br />