My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03419
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3400
>
pf_03419
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:00:34 PM
Creation date
6/28/2005 10:03:07 AM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3419
Planning Files - Type
Setback Permit
Address
2276 W Highway 36
Project Name
Anderson, Frances
Applicant
Asphalt Driveway Co
Status
Approved
Date Final City Council Action
8/12/2002
Additional Information
encroachment into 5' side yard setback to replace driveway
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Community Development Department <br />651.490.2279 . fax: 651.490.2931 <br />· Contractor must redesign the driveway so that it slopes away from the house, the <br />retaining wall, and from the adjacent property. Specifically, the driveway should slope <br />mostly west Ilorth toward road alld drablaf!e ditch alld to direct runoff onto your yard. <br /> <br />· The existing euh'ert adjacent West Righ....lay 36 must be relocated so that it lies at the <br />bottom of the ditch. Culvert to remaill ill same locatioll, mav be added to as drivewav <br />shifts Qpproximatelv 3 feet east. Culvert was orif!illallv installed bv MIlDOT. (Culvert is <br />currentlv at lowest point alld carries draillaf!e ditch water.) <br /> <br />· The driveway at the entrance to the property must be built-up to properly eo'/a the <br />relocated cuh'at and create an acceptable ent,}! grade lip and prevent street water from <br />enterillf! drivewav. <br /> <br />· The replaced swface of the driveway must be permanent, dust fi'ee surface such as <br />asphalt 01' COllcrete.. <br /> <br />· The contractor must schedule an inspection with the Enginecring Departmcnt and/or the <br />Building Inspector prior to the finish swfaee being applied. <br /> <br />The 10 day appeal time line has been waived on your Setback Permit allowing you and/or your <br />contractor to immediately begin the formal permit process. Have your contractor directly contact <br />either Thomas Paschke, the City Planner (651- 490-2236) or Gerry Proulx, the City Building <br />Inspector (651-490-2233). <br /> <br />Frances, I apologize for the inconvenience and inaccuracies in the August 8, 2002 letter. <br /> <br />Sincerely, <br /> <br />CITY of ROSEVILLE <br /> <br />~ <br /> <br />Dennis P. Welsch (651-490-2232) <br />Community Development Director <br /> <br />cc: D. M. Nelson 2280 West Highway 36 <br /> <br />\\Victoria\CommDev\Planning Files\3400-3449\3419 _Anderson, Frances\Approval Letter (revised 0801202).doc <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.