My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0126_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0126_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 1:16:31 PM
Creation date
1/22/2015 2:19:50 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
241
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />STANDARD FORM OF AGREEMENT BETWEEN OWNER AND CONTRACTOR <br /> <br /> <br />This AGREEMENT made as of the 26th day of January, 2015, by and between the City of Roseville <br />(hereinafter called the OWNER) and Mickman Brothers (hereinafter called the CONTRACTOR). This <br />AGREEMENT WITNESSETH, that the OWNER and the CONTRACTOR, for the consideration <br />hereinafter stated, agree as follows: <br /> <br />ARTICLE 1. WORK <br /> <br />The CONTRACTOR hereby covenants and agrees to perform and execute all work generally described <br />here and in accordance with the provisions of the plans and specifications as prepared by the City of <br />Roseville, and referenced in Article 5, as approved by OWNER. <br /> <br />City of Roseville Parks and Recreation Renewal Program <br />Proposal Package 2H Irrigation System Improvements <br />Roseville Project Number: 006-2014 <br /> <br />and to do everything required by this Agreement and the Contract Documents. <br /> <br />ARTICLE 2. CONTRACT TIME <br /> <br />2.1 Completion The CONTRACTOR agrees that the work contemplated by this contract shall be <br />fully and satisfactorily completed as stated in Section 2.4 DELIVERABLES of the Request for <br />accordance to the Contractors schedule approved by the owner and attached to this document. <br /> <br /> <br />2.2 Liquidated damages OWNER and CONTRACTOR recognize that time is of the essence of this <br />Agreement and OWNER will suffer financial loss if the Work is not completed within the times <br />specified in Paragraph 2.1 above, plus any extensions thereof allowed in accordance with the <br />General Conditions. They also recognize the delays, expense and difficulties involved in <br />proving in a legal proceeding the actual loss suffered by OWNER if the Work is not completed <br />on time. Accordingly, instead of requiring any such proof, OWNER and CONTRACTOR agree <br />that as liquidated damages for delay (but not as a penalty) CONTRACTOR shall pay OWNER <br />eight-hundred dollars ($800.00) for each day that expired after the time specified in Paragraph <br />2.1 for Substantial Completion until the work is substantially complete. After Substantial <br />Completion, if CONTRACTOR shall neglect, refuse or fail to complete the remaining Work <br />within the Contract Time or any proper extension thereof granted by the OWNER, <br />CONTRACTOR shall pay OWNER eight-hundred dollars ($800.00) for each calendar day that <br />expires after the time specified in Paragraph 2.1 for completion and readiness fir final payment. <br /> <br />ARTICLE 3. CONTRACT PRICE <br /> <br />The OWNER agrees to pay and the CONTRACTOR agrees to receive and accept payment in <br />accordance with the prices bid for the unit, or lump sum items as set forth in the Conformed Copy of <br />Proposal on file in the office of the City Manager of the City of Roseville, Minnesota, the aggregate of <br />prices based on the Pre-Award Document, is $215,815. Final payment shall be made in accordance with <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.