My WebLink
|
Help
|
About
|
Sign Out
Home
2015-01-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-01-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:27:23 PM
Creation date
1/22/2015 4:21:46 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED CONSTRUCTION <br />General Comments <br />City staff has worked closely with the neighborhood to develop preliminary plans that meet the <br />needs of both the neighborhood and the City at large. This is a Municipal State Aid (MSA) <br />roadway and state aid funds will be used to pay for a portion of the costs; the roadway must be <br />constructed to meet minimum MSA standards. The preliminary design, as presented in this <br />report, meets all applicable standards. <br />The proposed street width and parking is discussed in the following sections of the report. The <br />roadway will be constructed with a 10 -ton structural design, bituminous pavement, and <br />concrete curb and gutter north of Roselawn Ave. The new pavement section for the road will <br />be a reclaimed aggregate base with 4 inches of new bituminous pavement. This recommended <br />improvement will meet the City's and State Aid's minimum standard for a 10 -ton design <br />roadway. <br />The concrete curb and gutter will be B618 barrier curb design and will be constructed on both <br />sides of the roadway north of Roselawn Ave. There is also a small stretch of bituminous curb <br />south of Roselawn and this will also be replaced with concrete curb and gutter. <br />Existing street grades will be maintained in their current condition. The final design may take <br />advantage of some minor variations of a few inches in order to provide a better transition from <br />roadway to private driveways where possible. <br />The existing manholes and other structures will be adjusted as necessary as part of this project. <br />The sanitary sewer mains were lined in 2014. In addition, property owners with roots in their <br />sanitary sewer services will be given an opportunity to replace their services at their expense. <br />Staff is not recommending replacement of the watermain due to the low historical occurrence <br />of watermain breaks in this area. There may be some maintenance work on sanitary and water <br />main structures such as manholes, valves and hydrants as a part of this project that will be <br />funded by the appropriate utility fund. <br />If unsuitable material is encountered beneath the existing pavement during construction, it will <br />be removed and replaced with suitable backfill material. Any sod that is damaged as a result of <br />the project will be replaced. As staff is recommending maintaining the existing profile/grade of <br />the roadway, we do not anticipate impacts to in place driveways. If staff is able to make some <br />adjustments that favor the driveway grades and/or the transition from roadway to driveway, <br />driveway approaches will be removed approximately between the existing pavement and the <br />property line. The removed driveway will be replaced with similar material- bituminous or <br />concrete. <br />Project P -ST -SW -15-02 Feasibility Report <br />Victoria Street Reconstruction <br />ou <br />
The URL can be used to link to this page
Your browser does not support the video tag.