My WebLink
|
Help
|
About
|
Sign Out
Home
2015-01-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-01-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:27:23 PM
Creation date
1/22/2015 4:21:46 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Provide pathway facilities along all roads (pg 17): The design standards <br />recommend that a road with 35 MPH and over 1,000 ADT have a 5 foot <br />wide striped shoulder for bicycle use or an 8 foot wide trail. The plan <br />also recommends that we consider sidewalks in primarily residential <br />areas to minimize impacts to property owners. <br />• Provide a safe network of pathway linkages for pedestrians and cyclists <br />to and between educational facilities, churches, business centers, transit <br />stops, parks and open space. <br />• Provide pathway linkages for light traffic to the regional pathway <br />system. (pg 19) <br />• Pathways shall be part of roadway design and construction. (pg 21) <br />a. Pathway Recommendation <br />Staff recommends that a pathway be installed on the east side of Victoria Street. <br />South of Roselawn Ave staff recommends installing an 8 foot bituminous trail with a <br />5 foot boulevard where possible. Where necessary, the boulevard may be reduced <br />to zero and curb and gutter may be used to provide a barrier between the trail and <br />sidewalk. Final design may identify additional impacts to the cemetery and the <br />bordering vegetation that would modify this recommendation to a 6 foot sidewalk <br />with a 5 foot boulevard. A trail is preferred in order to meet the guidelines of the <br />Pathway Master Plan and to better connect Reservoir Woods and the trail along <br />Roselawn Ave with Larpenteur Ave and the regional facilities south of Larpenteur. <br />North of the Reservoir Woods trail connection staff recommends installing a 6 foot <br />concrete sidewalk with a 5 foot boulevard. The transition to a sidewalk at this point <br />is recommended in order to reduce impacts to the wetland and heavily wooded <br />areas north of Roselawn Ave. Also, this will reduce impacts to the private properties <br />located on the north section of the project. <br />North of County Road B the City will also be installing a 6 foot sidewalk along the <br />east side of Victoria Ave. While the roadway will be narrowed in some sections to <br />provide space for the new sidewalk, the roadway is not being reconstructed as part <br />of this project. This portion of the project will be funded with Park Renewal Bond <br />funds. <br />Staff anticipates minimal tree and vegetation removal on private property with the <br />installation of the proposed pathways but there will be considerable brush and tree <br />removal along the edge of the wooded areas north of Roselawn Ave. The City will <br />coordinate any replacements with property owners and work to minimize the <br />impacts to the wooded areas. <br />There is adequate right of way to construct the sidewalk without needing to obtain <br />additional easement. <br />Constructing a sidewalk along the east side of Victoria Street is consistent with the <br />goals and policies of the City's Comprehensive Plan and Pathway Master Plan. <br />2. Parking and mailbox locations <br />Project P -ST -SW -15-02 <br />Victoria Street Reconstruction <br />Pill <br />Feasibility Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.