My WebLink
|
Help
|
About
|
Sign Out
Home
2015-01-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-01-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:27:23 PM
Creation date
1/22/2015 4:21:46 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED FUNDING <br />A. Special Assessments <br />State Statute 429 has two major points to consider when justifying assessments, first, the <br />assessment has to treat similar properties equally, and second, the amount of the assessment <br />has to be equal to or less than the resulting increase in property value. Assuming this project is <br />completed by fall 2015, the final assessment amount would be determined following an <br />assessment hearing in the fall of 2016 and a thorough review of the proposed assessments by <br />the Council. The following City of Roseville assessment policies are being followed: <br />• To meet MSA standards, this road will be constructed to a 10 -ton design. <br />o For the purposes of assessment calculation, the estimated quantities are reduced to <br />reflect the cost to build a 7 -ton road. (7 ton road design is 6 inches of aggregate <br />base material with 3 inches of new bituminous pavement). <br />• Property zoned LDR1 and LDR2 shall be assessed up to 25% of the cost of a 7 -ton, 32 -foot wide <br />roadway. <br />• All other property zoning shall be assessed up to 50% of a 7 -ton, 32 -foot wide roadway. <br />• Costs associated with sidewalk construction are not assessed to property owners. These costs <br />are funded using MSA funds or Park Renewal funds for the area north of County Road B. <br />• Stormwater costs necessary to meet the requirements of the watershed district will be funded <br />by the Stormwater Utility Fund and will not become part of the assessable portion of the <br />project. <br />• Sanitary and Watermain repair costs will be funded by the appropriate utility fund and not <br />become part of the assessable portion of the project. <br />• The homes along the private drive off of Victoria Street (1935, 1945, 1965, 1967, 1971 and 1975 <br />Victoria St) will be assessed based on an equal share of the total frontage of this area along <br />Victoria Street. The total frontage along Victoria is 672.92 feet so each parcel will be assessed <br />for 122.5 feet of frontage <br />• The total frontage along both sides of Victoria Street is 10,921.69 feet. OF that frontage, <br />5,799.93 feet is owned by the City of Roseville or is owned by Roselawn Cemeterywhich cannot <br />be assessed for roadway projects based on Minnesota State Law. The per foot cost for the <br />assessments includes this frontage. <br />Assessment Summary <br />Estimated total street construction cost with required $1,290,805.20 <br />drainage <br />Estimated 7 -ton, 32 ft wide, street construction cost- with <br />required drainage $1,200,805.20 <br />Total Assessable Frontage (linear feet) 10,921.69 <br />Project P -ST -SW -15-02 <br />Victoria Street Reconstruction <br />26 <br />Feasibility Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.