My WebLink
|
Help
|
About
|
Sign Out
Home
2015-01-27_PWETC_AgendaPacket
Roseville
>
Commissions, Watershed District and HRA
>
Public Works Environment and Transportation Commission
>
Agendas and Packets
>
201x
>
2015
>
2015-01-27_PWETC_AgendaPacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2015 4:27:23 PM
Creation date
1/22/2015 4:21:46 PM
Metadata
Fields
Template:
Commission/Committee
Commission/Authority Name
Public Works Commission
Commission/Committee - Document Type
Agenda/Packet
Commission/Committee - Meeting Date
1/27/2015
Commission/Committee - Meeting Type
Regular
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Assessment Rate <br />100% of cost/foot <br />$109.95 <br />50% of cost/ foot <br />$54.97 <br />25% of cost/ foot <br />$27.49 <br />• Appraisals are underway to determine the influence of the improvement project on the value of <br />the properties proposing to be assessed. These appraisals will be completed before the <br />required notice for the public hearing is sent to benefiting properties. This feasibility report will <br />be amended at that time to reflect the maximum benefit to each type of property within the <br />project corridor. <br />B. Private Improvement Costs <br />In addition to the public work proposed, this project may include the construction of a number <br />of private improvements. The cost of these private facilities is the responsibility of the <br />benefiting property owner. The engineer's estimate does not include estimates for private work <br />• The benefiting property owner shall pay for private sanitary sewer repair. This cost may be <br />added to the property's assessment. <br />• The benefiting property owner shall pay for private driveway work. This cost must be paid in full <br />prior to such work and may not be added to the property's assessment. <br />C. Proposed Funding Summary <br />D. <br />Project P -ST -SW -15-02 <br />Victoria Street Reconstruction <br />27 <br />Feasibility Report <br />Estimated <br />MSA <br />Assessments <br />Stormwater <br />Utility <br />Parks <br />cost <br />Fund <br />Funds <br />Renewal Fund <br />Street <br />Construction <br />$1,290,805.20 <br />$1,139,689.88 <br />$151,115.32 <br />$0 <br />$0 <br />Sidewalk/ Trail <br />$290,440.00 <br />$170,440.00 <br />$0 <br />$0 <br />$120,000.00 <br />Construction <br />Stormwater <br />$215,000.00 <br />$0 <br />$0 <br />$215,000.0 <br />$0 <br />$0 <br />Improvements <br />0 <br />Water/Sewer <br />$37,000.00 <br />$0 <br />$0 <br />$37,000.00 <br />$0 <br />Repairs <br />Total <br />$1,833,245.20 <br />$1,310,129.88 <br />$151,115.32 <br />$215,000.0 <br />$37,000.00 <br />$120,000.00 <br />0 <br />Project P -ST -SW -15-02 <br />Victoria Street Reconstruction <br />27 <br />Feasibility Report <br />
The URL can be used to link to this page
Your browser does not support the video tag.