Laserfiche WebLink
<br /> <br />5 u~ ill <br />ao A benefit to the property, including, but not limited to, the elimination <br />of blight or unsightly or hazardous conditions, or the installation of <br />improvements and occupancy that will facilitate preservation or <br />redevelopment of the property, and/or <br />b. A benefit to the public, such as the creation of jobs, revenues, or the <br />provision of needed goods or services, and <br /> <br />WHEREAS, Section 1012.09B states: the City Council may attach conditions to <br />interim use permits. In reviewing interim use permit applications, the City will establish <br />a specific date or event that will terminate the use on the property. The Council will also <br />determine that the approval of the interim use would not result in adverse effects on the <br />public health, safety and general welfare, and that it will not impose additional costs on <br />the public if it is necessary for the public to take the property in the future; and <br /> <br />WHEREAS, Western Resources and Watkins Trucking are currently operating a <br />legally pre-existing non-conforming truck terminal and storage operation on other <br />portions of the property, at 2560 Long Lake Road within an "B-6" Mixed Use Business <br />Park zoning district, and <br /> <br />WHEREAS, Western Resources and Watkins Trucking has requested approval of <br />an Interim Use Permit to utilize adjoining parcel as a seasonal and peak period truck <br />parking and storage area, and <br /> <br />WHEREAS, exterior impacts such as parking, traffic, and noise, as well as the <br />spatial needs for the seasonal and peak period trucking and storage, are similar to those <br />needed for the adjacent legally pore-existing and non-conforming truck terminal do not <br />require interior or exterior expansion of the existing buildings and utilities, and <br /> <br />WHEREAS, the Roseville Planning Commission held the required public hearing <br />on June 4,2003 to consider the Western resources/Watkins request and recommended (5- <br />1) approval of the interim use permit, subject to the following standard interim use <br />conditions: <br /> <br />1. If the use is being operated by a person other than the current applicants <br />(Watkins) for the Interim Use Permit of the property, the permit shall require <br />both the owner and the operator to furnish the city with an agreement (or a <br />copy of a lease containing such agreement) that: <br />a. the operator's right to possession of the premises for the purpose of <br />conducting the interim use is dependent upon the interim use permit <br />having been granted and maintained in full force and effect; and <br /> <br />2 <br />