My WebLink
|
Help
|
About
|
Sign Out
Home
pf_03616
Roseville
>
Planning Files
>
Old Numbering System (pre-2007)
>
PF3000 - PF3801
>
3600
>
pf_03616
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2007 2:38:22 PM
Creation date
6/6/2006 3:59:54 PM
Metadata
Fields
Template:
Planning Files
Planning Files - Planning File #
3616
Planning Files - Type
Interim Use Permit
Address
2880 WALNUT ST
Applicant
Shafer Contracting
Status
Approved
PIN
082923320001
Date Final City Council Action
12/28/2005
Planning Files - Resolution #
10281
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />processing equipment will be operated on two or three separate occasions for approximately three <br />weeks duration each time, The recycle processing would be an intennittent use. <br /> <br />. The gravel base will be hauled and placed on the roadbed prior to paving. <br /> <br />. Portable concrete batching equipment will be set up on the staging site. Aggregates will be <br />delivered to the staging site and concrete will be mixed and hauled to paving equipment on the <br />project site. It is anticipated that mixing equipment will be set up on the site on three or four <br />separate occasions for approximately two to three weeks duration each time. Even then there <br />may be days of non-operation because of concrete pavement curing requirements. The mixing <br />operation would be an intern1ittent use. <br /> <br />. Equipment and trucks used for construction on the project will also be parked on the site. <br /> <br />. The project involves multiple stages and requires maintaining access to businesses and side <br />streets. <br /> <br />The Site <br /> <br />The Meritex Property is an approximate 5 acre parcel. The site has been used for snow storage <br />during 'Hinter months. There is an existing salt storage bunker on the parcel, which would remain in <br />place. The property, triangular in shape, is abutted by railroad tracks on the east and west and <br />Terminal Road on the north. The property is zoned 1-2, Industrial. <br /> <br />Meritex owns several abutting parcels. The property is surrounded by commercial and industrial <br />uses, much of it trucking or truck storage related. There is no residential use in the immediate area, <br /> <br />The site provides access to the project, T.R. 280 and 35W via Tern1inal Road, St. Croix Street, <br />Walnut Street, Long Lake Road and Cleveland Avenue. <br /> <br />Operation Details <br /> <br />. Erosion control <br />o The property is currently surfaced in some areas with gravel. The balance of the area is <br />sparsely covered with grassy vegetation. Upon termination of the interim use, the area <br />will be reseeded and restored to its existing condition. <br /> <br />. Dust Control <br />o Water and dust palliatives will be used to control dust from trucks and processing <br />equipment. Our dust control policy is attached. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.