Laserfiche WebLink
<br /> <br />The County Road C proj ect <br /> <br />benefit because: <br /> <br />.. Operations will be centralized. Perfonning some project functions at the staging site will <br />eliminate congestion on the project site. This may result in decreased overall construction time <br />which will benefit the community and traveling public. <br /> <br />. Quality and delivery of mixed concrete will be more consistent, resulting in a better quality <br />finished product. There is a direct correlation between concrete pavement quality and pavement <br />life. <br /> <br />.. The construction process will have a minimum of disruptions from the already congested and <br />clogged surrounding arteries resulting in better productivity. During the 2005 construction <br />season, County Road C will be reduced to one lane of traffic in each direction. Minimizing the <br />number of trucks required to build the project will benefit the traveling public, adjacent <br />businesses and the construction process. <br /> <br />Attachments <br /> <br />.. Map of project and interim use area. <br />o Interim use site air photo <br />.. Interim use site layout - air photo <br />.. Site photos <br />. Pavement recycling equipment photos <br />.. Concrete batching equipment photos <br />.. Vibration analysis report <br />.. Noise analysis report <br />.. Dust control and prevention policy <br /> <br />