Laserfiche WebLink
<br /> <br />setbacks of <br />20) are <br /> <br /> <br />meets <br /> <br />(16 to <br /> <br />6) <br /> <br />Signage for and <br />Roseville and <br />1010 of the City Code. <br /> <br />must meet <br />lot <br /> <br /> <br />1 of the <br />to meet Section <br /> <br />7) A landscape plan will be required that meets the requirements of the Street Tree <br />Master Plan for boulevard trees along Pascal Street and County Road B, as well <br />as internal landscaping consistent with Section 1010. The existing mature <br />landscaping along the boulevard and within the parking setback area should be <br />used whenever possible to soften and screen the parking. <br /> <br />Although the City Code does not provide for conditions to be placed on a Rezoning request, we <br />want to reiterate the concerns expressed by the Planning Commission and City staff relative to <br />general traffic flow and specifically regarding east bound left turns from County ~ad B into the <br />site at 1445 County Road B. We hope to address these concerns with Dan Soler, Ramsey County <br />Traffic Engineer and Deb Bloom the City's Assistant Public Works Director. <br /> <br />We look forward to construction of the new TCF facility in Roseville, and if you have any <br />questions relative to the Council's action, please call me. <br /> <br />Sincerely, <br /> <br />OF ROSEVILLE <br /> <br /> <br />Dennis Welsch <br />Community Development Director <br />651-792-7071 <br /> <br />Cc: Zinm1erman Real Estate, 1954 University Avenue, St. Paul, MN 55104 <br />Mr. Dan Soler, Ramsey County Traffic Engineer, 1425 Paul Kirkwold Dr., Arden Hills, MN 55112 <br />Ms. Deb Bloom, Asst. Public Works Director <br />