Laserfiche WebLink
<br /> <br /> <br /> <br />Thomas <br />Enclosed are comments the horticultural <br />a copy and sent a copy the <br />comments are directed at <br />to grow on the harsh site of sub-soil <br /> <br />of the <br />architect. The <br />the <br /> <br /> <br /> <br /> <br />let me <br /> <br />Ed <br /> <br />COMMENTS ON THE "PLANTING NOTES" WRITTEN ON THE MAY 5 LANDSCAPE PLAN. <br />The landscape architects text is in normal typeface. Our comments are in <br />italics. Some comments are advisory. Others request clarification. <br /> <br />1.AII quantities, shapes of beds and locations shall be verified and <br />adjusted as required to conform to the exact conditions of the site. Review <br />with landscape architect prior to digging. <br /> <br />2. Locate all utilities.... <br /> <br />3. The contractor shall be responsible for complying with all applicable <br />codes.... <br /> <br />4. The contractor shall be responsible for all mulches and planting soil <br />quantities to complete the work shown on the plan. Verify all quantities <br />shown on the schedule. <br /> <br />5. The contractor shall remove from the site.... plant stock not <br />planted on day of deliver y shall be heeled in and watered until <br />instaHation. Plants not maintained in this manner will be rejected. <br /> <br />6. The contractor shall keep pavement.... <br /> <br />7.The plan takes over the plant schedule if discrepancies exist. <br />The specifications take precedence over the notes and <br />notes. <br /> <br />8. Existing trees and shrubs to remain shall be protected to the drip line <br />shall be protected from construction traffic, storage of materials, etc. <br />with four foot height orange plastic safety fencing adequately supported <br />....If possible reduce use of heavy equipment in advance of planting. An <br />immediate problem is traffic over the spruce roots at southeast corner of <br />existing parking lot. protect the spruce roots. You may wish to list <br />exhaust from idling machinery before the the "etc" <br /> <br />9. No substitutions of plant material shall be accepted unless approved.... <br /> <br />1 O. All planting stock shall conform to the American Standard of Nursery <br />Stock ANSI - ???60 latest edition..... <br /> <br />11. All plants shall be guaranteed for one year unless otherwise <br />specified. The guarantee shall cover specified (words are missing) The <br />guarantee shall cover the full cost of replacement including labor and <br />