Laserfiche WebLink
CONCLUSIONS lj 2%#/--%.$!4)/.3 <br />A.All portions of the project proposed are feasible. <br /> <br />B.Estimated project cost: <br /> <br /> <br />Project Cost <br />Street Reconstruction $1,290,805.20 <br />Sidewalk Construction Segment A $170,440.00 <br />(Larpenteur Ave to County Road B) <br />Sidewalk Construction Segment B $120,000.00 <br />(County Road B to County Road B2) <br />Storm Sewer Construction $215,000.00 <br />Utility Maintenance $37,000.00 <br /> <br />Total $1,833,245.20 <br />The following is a summary of the recommendations discussed in this report. <br />A.Construct the project in 2015 <br /> <br />B.Construct a 6 ft wide concrete sidewalk along the east side of Victoria Street north of Roselawn <br /> <br />Ave, extended north to County Road B2 (roadway reconstruction stops at County Road B) <br />C.Construct an 8 ft wide bituminous path along the east side of Victoria Street south of Roselawn <br /> <br />Ave (subject to change to a 6 ft sidewalk based on final engineering). <br />D.Declare Victoria Street an urban section from Larpenteur Avenue to County Road B and <br /> <br />reduce the speed limit to 30 miles per hour, which is the statutory speed limit for an urban <br />section, in order to address geometric deficiencies that would exist with a 40 mile per hour <br />design speed. <br />E.South of Roselawn Ave: <br /> <br />Construct a 32 ft wide, bituminous street with a rural design (no curb and gutter) <br /> <br />11 foot lanes <br /> <br />Prohibit parking on one side of the roadway (proposed west side of roadway) <br /> <br />Provide a 2 ft shoulder on the west side of Victoria Street <br /> <br />Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br /> <br /> <br />F.North of Roselawn Ave: <br /> <br />Construct a 32 ft wide, bituminous street with B-618 concrete curb and gutter. <br /> <br />11 foot lanes <br /> <br />Prohibit parking on one side of the roadway (proposed west side of roadway) <br /> <br />Provide an 8 ft shoulder on the east side of Victoria Street for parking. <br /> <br /> <br />G.Repair sanitary sewer and watermain infrastructure along the corridor as needed. <br /> <br /> <br />Project P-ST-SW-15-02 Feasibility Report <br />Victoria Street Reconstruction <br />12 <br />