My WebLink
|
Help
|
About
|
Sign Out
Home
2015_0223_CCpacket
Roseville
>
City Council
>
City Council Meeting Packets
>
2015
>
2015_0223_CCpacket
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/24/2015 1:19:04 PM
Creation date
2/19/2015 2:19:18 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
H.Construct storm sewer improvements to address water quality, meet watershed requirements <br /> <br />for new impervious surfaces, and address drainage concerns along the corridor. <br />I.Fund the reconstruction project with Municipal State Aid funds, utility funds, assessments and <br /> <br />Park Renewal Bond funds as detailed this report. <br />J.Schedule a public hearing for the Victoria Street project on Monday, February 23, 2015. <br /> <br /> <br /> <br />Project P-ST-SW-15-02 Feasibility Report <br />Victoria Street Reconstruction <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.